TL;DR

Up to 70% of renewable connection requests could go unconnected if European grids are not reinforced over the next one to two decades — and the planning methods still in use make that worse by sizing for a worst-case day. Rao and Herndler make the case for automated planning that treats batteries and flexibility as alternatives to copper, claiming up to 30% off total infrastructure cost. On AI they are precise about the boundary: agents orchestrate the workflow, physics simulators do every calculation, and no European DSO will let a language model near a SCADA system.

Synopsis
Barbara Herndler and Bharath Varsh Rao of AIT join The Energy Bridge to argue that the energy transition is won or lost in the distribution grid. They lay out the connection-queue crisis — up to 70% of renewable requests unconnectable without reinforcement — and why traditional worst-case planning, built on a flat load-growth assumption, leaves efficiency on the table. Rao describes the AIT spin-off he is founding, Rapson, which automates network development planning and weighs non-wired alternatives such as battery storage against digging up a street in Vienna. Both are careful about AI's limits: language models orchestrate simulations but never compute numbers, and DSOs will accept an advisory layer beside the control room but nothing inside it. The conversation also covers vehicle-to-grid versus vehicle-to-home, optimal sensor placement, climate-driven outage risk in Turkey, and the tacit knowledge retiring out of grid operators.

Key metrics

by the numbers · 6
  • 70%
    share of renewable generation connection requests that could remain unconnected if grids are not reinforced
  • 3%
    flat annual load growth traditionally assumed in worst-case grid planning
  • 30%
    total infrastructure cost Rao expects automated planning with non-wired alternatives to save
  • 10%
    rule-of-thumb share of grid nodes needing sensors to achieve full observability
  • 99.9998%
    grid reliability in Austria and Europe, which Rao credits for DSO conservatism
  • 400 billion
    euros Europe is already investing over ten years in electrification, grid expansion and retrofit

Topics

8 tags
grid planningdistribution gridse-mobilityartificial intelligenceflexibilityvehicle-to-griddigital twinsgrid connection queues
Stats
Duration
1h 05m
Words
12.1k
Questions
41

Timeline

12 chapters
  1. The transition happens underneath Vienna

    Rao frames the episode: Europe has bet its competitiveness and sovereignty on the energy transition, and the power grid is the bottleneck.

  2. Rapson, the spin-off

    Rao is leaving AIT to commercialise eight years of research as an automated grid-planning company, named after the mathematician behind the Newton-Raphson method.

  3. The connection queue

    Up to 70% of requests to connect wind and solar could stay unconnected without reinforcement — the status quo, not a worst case.

  4. What worst-case planning costs

    Assuming a flat load growth and the worst summer and winter day leaves inefficiency on the table and puts copper where demand is not.

  5. Agentic planning, with physics doing the maths

    Agents orchestrate load flows and reinforcement algorithms and can draft the report, while every number comes from a physics simulator and every step is logged for audit.

  6. Non-wired alternatives

    Why a small battery supporting a local grid can beat digging up a Vienna street, and how planning tools must weigh both options.

  7. Vehicle-to-grid versus vehicle-to-home

    Herndler places V2G firmly in research — open questions from manufacturers down to operating mode — with vehicle-to-home and fleet depots the nearer opportunity.

  8. Climate risk on exposed networks

    A Turkish pilot on the Karaburun Peninsula, where overhead distribution meets extreme wind, storms and wildfire, and tower sensors enable predictive maintenance.

  9. Where to put the sensors

    State estimation means observability does not require a meter at every node; roughly 10% of nodes, placed algorithmically, is enough.

  10. Why no LLM goes near the control room

    SCADA is critical infrastructure and AI is a black box, so the realistic role is an advisory system beside it with an expert operator deciding.

  11. Tacit knowledge walking out

    Experienced grid staff are retiring with knowledge that was never written down, and new technicians cannot absorb a system this complex quickly.

  12. Quick-fire round

    Blockchain as the most overhyped, a faster load-flow solver as the most underrated, and why Rao thinks a billion euros is the wrong order of magnitude.

Key insights

5 takeaways
  • 01

    The connection queue, not generation cost, is the binding constraint

    Rao cites estimates from European institutions, research organisations and DSOs that without reinforcement over the next 10 to 20 years up to 70% of renewable connection requests will remain unconnected. The projects exist and the capital exists; the grid is what stops them, which is why he calls the grid the place the transition is actually decided.

  • 02

    Worst-case planning is why reinforcement money lands in the wrong places

    Traditional practice assumes a flat load growth figure and plans against the worst summer and winter day. That over-reinforces areas without demand while under-serving hot spots, and Herndler's team instead does regionalised techno-economic analysis to tell DSOs where adoption of EVs or heat pumps will actually concentrate.

  • 03

    The credible AI architecture keeps the model away from the arithmetic

    Rao is explicit that language models never compute: agents orchestrate load flows, optimal power flows and reinforcement algorithms, and the numbers come from physics simulators that DSOs have trusted for decades. Every step is recorded for audit so the resulting network development plan can be reviewed — reproducibility being the condition for using any of this on critical infrastructure.

  • 04

    DSO conservatism is earned, not cultural

    Rao says he used to call DSOs conservative and no longer does. At 99.9998% reliability, the mindset protecting that number is rational, and it explains why operators want pilots and proof before adopting new tools — and why no European DSO is interested in AI anywhere near a SCADA system.

  • 05

    The staffing gap is a knowledge-transfer problem, not just a headcount one

    Both guests return to the shortage of qualified network planners, but the sharper risk they name is tacit knowledge: experienced technicians are retiring with expertise that was never documented, and the replacements cannot quickly comprehend a system this complex. Automation is pitched partly as a response — freeing planners to work as grid architects rather than running simulations by hand.

Pull quotes

6 quotes
  • Why 8 years? You can ask yourselves because that's what it takes.
    Bharath Varsh Rao
  • So we will not use LLMs to compute anything.
    Bharath Varsh Rao
  • We cannot plan the grid with the tools of 1990s to the plan the grid of the 2040s.
    Bharath Varsh Rao
  • 99.9998% reliability is unbelievable.
    Bharath Varsh Rao
  • Blockchain is definitely over.
    Bharath Varsh Rao
  • Everybody can be a superhero in the energy transition
    Barbara Herndler
Transcript1827 cuesClick a timestamp to jump
  1. Welcome to a new episode here in the
  2. energy bridge. Uh today we have the
  3. pleasure to have Barat and Barbara from
  4. Austria Institute of Technology AIT. In
  5. this episode we have many surprises and
  6. the first one is that Barat is going to
  7. make the context of this episode what is
  8. important what we are going to talk
  9. about. So pleased about that.
  10. >> Really good to be uh back
  11. with uh with you guys the energy bridge
  12. here in Vienna actually. Beautiful sunny
  13. afternoon.
  14. >> Yeah, finally it's wonderful.
  15. >> Spring starting finally.
  16. >> Yeah. I am Paratra. uh with Austrian
  17. Institute of Technology in the group of
  18. power system digitalization uh as well
  19. as uh soon to be a bigger group
  20. combining two different groups which is
  21. power system planning or operation which
  22. will be merged into power systemization.
  23. I think the new name is power system
  24. planning operation and digitization.
  25. >> Yeah, we're still discussing the name.
  26. >> All right. Okay. [laughter]
  27. Yeah. Uh I would love to provide the uh
  28. the context uh for today. So the energy
  29. transition that uh that that's happening
  30. right now uh Europe is going all in. So
  31. Europe is pretty much fully invested in
  32. energy transition. So we are betting our
  33. our future our economy uh for energy
  34. transition our competitiveness as well
  35. as our sovereigntity. So we need to make
  36. sure that uh we can deliver this and uh
  37. right now uh in the parliaments in
  38. boardrooms in in in the editorial boards
  39. of newspapers everybody is discussing
  40. about exactly this topic. How can we
  41. deliver energy transition without
  42. bankrupting ourselves? Right now I want
  43. to make a a humble statement that uh
  44. energy transition
  45. is going to happen in the power grid.
  46. >> So it happens right underneath us here
  47. in Vienna kilometer by kilometer. So
  48. this is where the energy transition is
  49. happening. This is the bottleneck. So
  50. this is the context that I'd love to to
  51. talk more about today with with the
  52. three of you. So just on that note um
  53. very welcome guys and to you as well
  54. Barbara you are very summerlike today
  55. and yeah completely how the weather is
  56. in in Vienna but uh thank you very much
  57. guys and and also for making the context
  58. >> let's dive in deeper but uh before we
  59. dive in deeper into the the the big
  60. context that you made we would love to
  61. know about you please introduce yourself
  62. about your role and uh how you have come
  63. across doing what you do currently. We
  64. we start with Barbara.
  65. >> So, good afternoon everybody and thank
  66. you for having me here today. I'm very
  67. excited to be here. This is my first
  68. podcast. So, let's see how this
  69. develops. But yeah, so um as I already
  70. mentioned, my name is Barbara. I was
  71. born and raised in South Africa, so a
  72. long way from home, but I've found
  73. myself here in Austria um with a lot of
  74. new opportunities and a lot of new
  75. challenges. I'm very happy to be here.
  76. So my current context um in the role of
  77. the power system and planning and
  78. operation at AIT I'm a research
  79. engineer.
  80. >> Um I also focus a lot on the e-mobility
  81. topics looking at various interactions
  82. between the DSOS the TSOS also um
  83. focusing on how we can integrate new
  84. technologies with into the power grid
  85. and yeah also trying to serve as a good
  86. um project manager together with my
  87. teams.
  88. >> And you you did your study at in South
  89. Africa.
  90. >> Yes that's correct. So I was born and
  91. raised Johannesburg but uh studied in
  92. Cape Town. So
  93. >> and what did you study your initial
  94. study?
  95. >> So electrical engineering. So I'm very
  96. much a power systems engineer. Yeah.
  97. Hardcore engineering. [laughter]
  98. >> Yeah.
  99. >> We can go deep.
  100. >> Yeah. And and you Barrett?
  101. >> Yeah. I already uh mentioned uh about my
  102. role uh at uh within the group of power
  103. systemization. Uh I'm a scientist and
  104. business developer there. So um I do a
  105. bit of project management research
  106. projects as well as try to commercialize
  107. the uh the solutions that uh we produce
  108. across many research projects um in our
  109. entire team. Uh the bigger team or
  110. bigger group is called power and
  111. renewable gas systems. So it's uh it's
  112. both electrical energy system as well as
  113. uh renewable gas system. So it's it's
  114. both. So it's quite a large group uh
  115. that we have at at AIT. And my
  116. background is in power system
  117. engineering. Um so I have a bachelor's,
  118. masters and PhD in in power system
  119. engineering. 10 years of experience a
  120. lot of uh different uh Austrian European
  121. international level projects. So right
  122. now I'm in the process of uh actually
  123. quitting AIT.
  124. So creating my own spin-off and uh
  125. hopefully next year spin out of AIT and
  126. create a a company of my own.
  127. >> Yeah, that's the other that was other of
  128. the surprises. Today we are breaching
  129. academia, industry, policy makers and
  130. innovators within energy sector and you
  131. are pretty much both of you reaching
  132. from the research um bringing solution
  133. innovative solutions to the industry and
  134. we have something here on the table
  135. which is the Hushka prize that um
  136. Barbara won with your team last year and
  137. recently yesterday was right
  138. >> the day before yesterday.
  139. >> The day before yesterday you won it
  140. again. So we have some applauses
  141. [laughter]
  142. but uh yeah if if you can tell us uh a
  143. bit what is the prize about and you can
  144. tell us about the spin-off of your own
  145. startup out of 80.
  146. >> Yeah we were very humbled uh to receive
  147. the the award for 2026. Uh so for the
  148. project uh called Wterara. So Wterara is
  149. a research innovative
  150. that was within AIT. So it was part of
  151. many research projects across uh eight
  152. years approximately uh with many funded
  153. projects um uh national Austrian as well
  154. as European projects and also one
  155. international project. So uh we were
  156. able to fully develop the solution from
  157. let's say TRL one like the fundamental
  158. idea that we came up with uh to right
  159. now TRL 7 or 8 very close to the to the
  160. market. So we're able to fully develop
  161. this. Why 8 years? You can ask
  162. yourselves because that's what it takes.
  163. Yeah. Because this is a very difficult
  164. field. We need to be able to do it
  165. correctly. Develop the solutions that is
  166. trustworthy to our clients who are
  167. distribution system operators
  168. >> who manage a critical infrastructure.
  169. >> So we we have to make sure that
  170. everything works perfectly and it needs
  171. to be meticulous and it is a slow
  172. process unfortunately. That's how it is.
  173. Yeah. To to come to a point where you
  174. can sell it and then actually put it in
  175. the real world and we need to make sure
  176. that everything is is is correct and
  177. that's the reason it takes a lot of
  178. time. Yeah. And regarding the spin-off
  179. um so the spin-off is going to be called
  180. Rapson. So named after Joseph Rapson
  181. who's a mathematician.
  182. >> He's known for Newton Rapson method
  183. which is
  184. >> Yeah, I remember it. Yeah. which is the
  185. the most important uh mathematical tool
  186. for computing uh load flows or power
  187. flows in in power system and Newton is
  188. quite famous Rapson actually not not so
  189. much not very well known so we decided
  190. that we would give him give a bit of a
  191. homage
  192. >> to just rapson and uh that's why it's
  193. called Rapson and um I would say a lot
  194. of tools that were part of Voltera will
  195. be taken into Rapson and and we'll
  196. create a commercial solution out of it
  197. and hopefully it'll help a lot of our
  198. clients who are distribution system
  199. operators of Austria, Europe and also of
  200. course worldwide.
  201. >> Amazing. And and for you Barbara, what
  202. was the project about and and and you
  203. and [laughter]
  204. which among your team was working on the
  205. project?
  206. >> Um so basically it was actually last
  207. year um that but with the project is
  208. still ongoing. So it's actually called
  209. the Medusa project which focuses on the
  210. development of a multimegawatt charging
  211. system and how to integrate that within
  212. the power system as well. So we also see
  213. that the directions of uh e-mobility for
  214. electric vehicles not only for the
  215. vehicles themselves but also towards
  216. trucks and buses.
  217. >> So this is also becoming quite a big
  218. challenge and the industry is moving
  219. quite fast in this regard. Um but also
  220. what does it actually mean for the power
  221. system and in this project we're
  222. developing the solutions and
  223. investigating how to integrated in a
  224. better way. At the beginning as Barat
  225. mentioned it's uh we are navigating in
  226. this energy transition and to deploy
  227. more copper is much slower than utilize
  228. the grid more smartly. So you are using
  229. AI to do that and also Barbara you
  230. mentioned that you are um working in the
  231. grid planning. So how do you take into
  232. account these new solutions to how do
  233. you plan a grid?
  234. >> Yeah. So this is quite a challenging
  235. question and it's not a simple answer.
  236. >> So I mean I think every like system
  237. operator has their own approaches
  238. because the as we already know the
  239. networks are very heterogenous. So each
  240. let's say system operator has their own
  241. unique challenges. Um but I mean at the
  242. same time the energy transition is
  243. transitioning into a way where we have
  244. to accept and adopt new technologies
  245. such as photovalttaic electric vehicles
  246. and of course heat pumps just to mention
  247. a few
  248. >> and I mean I think all DSLRs are seeing
  249. this challenge and I think connection
  250. times are also becoming a big problem.
  251. So waiting times, how to connect in in a
  252. fast way. Um we see that waiting times
  253. are accelerating because to keep up with
  254. this technology, I mean it's not it's
  255. not very linear. It's like accelerated
  256. in an exponential level. And I think
  257. it's good that people are accepting the
  258. new technologies and adopting them, but
  259. at the same time it's very challenging
  260. for our DSOs.
  261. >> Yeah. And no a following question that
  262. you mentioned permitting because uh I I
  263. also obtain permits in Chile for for
  264. projects. So I know the pain of the
  265. whole process and
  266. >> and now Barrett you mentioned in the
  267. last forum um that the grid operators
  268. use the worst case scenario to give
  269. permits
  270. >> but what would it be if to this approach
  271. would it be
  272. >> optimized with AI forecast or whatever
  273. how do you see that
  274. >> yeah I mean that's that's a valid
  275. question um so right now just again uh
  276. to to take a step back a bit uh so right
  277. now uh so we can estimate or eur
  278. European and institutions as well as a
  279. lot of research organizations and also
  280. DSOs are estimating that if we don't
  281. upgrade the grid in the next 10 15 20
  282. years up to 70% of all the requests for
  283. renewable energy generations for example
  284. wind parks solar parks will be uh
  285. remained unconnected so you cannot
  286. connect them because the grids are not
  287. ready right now
  288. >> so we have% below the
  289. >> so 70% of of connections could just stay
  290. there and then the projects cannot be
  291. realized
  292. because the grid is not ready. This is
  293. the the status right now we're in at the
  294. moment up to 70% if you don't reinforce
  295. the grid.
  296. >> Yeah. Yeah, and that's where all this
  297. you know challenges about uh uh the the
  298. permission and then the connection
  299. requests comes into picture because you
  300. want to be able to very quickly perform
  301. the simulations and and you know provide
  302. accurate information to DSOs where to re
  303. reinvest the grid or reinforce the grid
  304. and when to reinforce the grid and how
  305. how much to reinforce the grid because
  306. there's only a certain amount of uh
  307. funding that goes every year to grid
  308. reinforcement. you want to make make
  309. sure that it goes in in the right
  310. places,
  311. >> right? So that's super critical and you
  312. don't want to re reinforce the grid
  313. where there is not a lot of demand and
  314. that's where the linearity comes into
  315. the picture
  316. >> because right now uh traditionally grid
  317. reinforcement is done with just by
  318. considering uh you know let's say 3%
  319. load growth in a certain region and this
  320. is you know it's called worst case
  321. planning. You just assume that uh there
  322. is the worst day in summer and worst day
  323. in winter and then you do you know
  324. planning based on that. Mhm.
  325. >> Yeah. This is a lot of inefficiency just
  326. sitting on the table. You're
  327. reinvesting. You're spending a lot of
  328. you know again copper and uh you can do
  329. it better and more intelligently. I
  330. think this is where you know one of the
  331. projects that Barbara was part of and
  332. and her team in power system planning
  333. and operation uh they did it the right
  334. way.
  335. >> So we're also looking at ideas of more
  336. like in a way of regionalization
  337. approaches.
  338. example identifying where the hot spots
  339. would be for to certain technologies and
  340. prioritizing where the reinforcement
  341. requirements actually are. So I mean
  342. identifying certain areas for example
  343. which we might foresee a higher um
  344. adoption of electric vehicles for
  345. example in the future what the demands
  346. there would be in terms of network
  347. reinforcement and how much it would
  348. actually cost. So we can do this so to
  349. say a technoeconomic analysis of how um
  350. these approaches should be done and help
  351. the DSOS prioritize what their needs are
  352. and where. But it's not only the fact
  353. that it's just the where the funding
  354. comes from. It's also about the
  355. manpower. So I mean also it also needs
  356. some effort from personnel. Um not
  357. everybody can be everywhere at once but
  358. this again helps to identify where the
  359. priority areas are.
  360. >> You both don't work in the same team
  361. right or you it's like a same umbrella
  362. team that you work in.
  363. >> So when we combine uh these two groups
  364. she's going to be my boss. [laughter]
  365. >> But we work very closely together. So I
  366. mean within power system planning and
  367. operation we cannot achieve it without
  368. the digitalization aspect. So I think
  369. the the two are very much overlapping.
  370. We have many overlapping projects
  371. together publications and so on. So I
  372. think it's it's a good combination and
  373. it would be a nice way move forward to
  374. combine the two teams.
  375. >> That's what I wanted to understand as
  376. well like how exactly a function and how
  377. exactly you guys complement each other
  378. in your function and in your projects.
  379. >> Yeah. Uh it's a very uh uh very close uh
  380. collaboration between power system
  381. planning or operation and power system
  382. digitalization groups here at IIT
  383. because digitalization is key in pretty
  384. much every field right now.
  385. >> Mhm.
  386. >> And especially in in power system uh
  387. planning and operation. So that's where
  388. a lot of projects Walter is the best
  389. example right. So we have a lot of AI
  390. going AI solutions in Walter
  391. >> and and we work closely with the
  392. colleagues from the Barbara's team.
  393. Yeah. to to realize the uh because they
  394. bring the power system expertise and
  395. then we bring the power expertise of
  396. course with the AI and visualization
  397. expertise.
  398. >> Barrett, what could you tell us about uh
  399. the interaction or the intersection
  400. between AI and network planning for
  401. example?
  402. >> Yeah, I mean that's uh that's something
  403. that we are uh looking into at the
  404. moment especially with the all this uh
  405. agentic approaches where uh the the name
  406. of the game is automation. And this also
  407. ties into something that I mentioned
  408. earlier uh also the industry issues with
  409. uh with not enough you know people who
  410. are uh experienced and expert in this
  411. topics uh or mainly network planners.
  412. Yeah. Uh and with uh with this agentic
  413. approach we can uh you know calculate
  414. multiple a multitude of you know tools.
  415. So for example, if you want to do
  416. network planning, you need to be able to
  417. first run a load flow, right? You need
  418. to run like a few more load flows to
  419. figure out what the uh what the issue is
  420. in the grid and then you need to run an
  421. optimal reinforcement algorithm for
  422. example. So all of these are very
  423. mathematical and uh it needs a lot of
  424. you know uh um input configuration and
  425. all of this can be fully automated with
  426. AI. So this is what we're trying to do
  427. with Rapson as well. Mhm.
  428. >> So where we have like a fully end toend
  429. automated uh tool where a genetic
  430. systems orchestrates different
  431. simulations that that need to
  432. [clears throat] run and ultimately can
  433. also write a report for you. So that's
  434. that's that's the whole automation uh
  435. that we are trying to bring to uh grid
  436. planning and then AIS can really help
  437. with this. Yeah. And of course we need
  438. to be careful. Yeah. Every step needs to
  439. be uh uh recorded for audits and
  440. reviews. Yeah. to make sure that the the
  441. network development plan that comes out
  442. of this uh uh tool is actually valid.
  443. Yeah. And that's the reason LLMs never
  444. do any kind of computation. So all the
  445. numbers everything that are computed are
  446. backed by physics simulators. So physics
  447. inform simulation.
  448. >> Yeah. They are not very good in maths
  449. >> of course. [laughter] So we will not use
  450. LLMs to compute anything. So it's it's
  451. traditional power system tools
  452. >> like optimal power flow load flow behind
  453. which actually does the calculations.
  454. >> So the agents only call those
  455. simulations and then orchestrate the
  456. whole flow
  457. >> and that's the reason we can ensure that
  458. the uh the answers are are actually
  459. accurate
  460. >> and and you would say that the AI based
  461. stimulator the the math based stimulator
  462. would be better than the AI based
  463. stimulator in a way
  464. >> all the time of course. Yeah because
  465. also the trust is is important.
  466. >> Yes. because the grid operators trust
  467. these tools that have been around for 50
  468. 60 years.
  469. >> Mhm.
  470. >> Yeah. And then we uh cannot assure that
  471. the uh the results coming out of an AI
  472. LLM is accurate which is obvious and
  473. this this we know it elucidates a lot.
  474. Yeah. And uh this is critical
  475. infrastructure. So we need to be able to
  476. prove and reproducible results is is the
  477. key.
  478. >> And and at AIT uh do you have a
  479. specialized AI team or that's like
  480. everyone is working?
  481. Yeah. I mean um AIT is part of um uh I
  482. >> mean it's AIT [laughter]
  483. factory.
  484. >> AI factory. Exactly. Exactly. So uh
  485. there's a group called uh digital safety
  486. and security. So they are responsible
  487. for the uh AIAT which is the AI factory
  488. of Austria.
  489. >> Uh it's still under construction at the
  490. moment. um and they are responsible for
  491. pretty much uh boosting uh the entire AI
  492. industry of Austria. So any startup any
  493. industry uh uh uh you know players want
  494. to develop and and use compute
  495. infrastructure so this is possible to
  496. get from the air factory
  497. >> and AIT is the uh founding member of a
  498. >> yeah it's a leading leading member uh
  499. for the infrastructure as well as a lot
  500. of you know services coming out of the
  501. uh the air factory but every single
  502. research institution university are
  503. stakeholders of of the air factory
  504. >> but you you have been able to uh start a
  505. company within AIT. Uh would you walk us
  506. through how does uh the whole
  507. entrepreneurship system or a catalyst? I
  508. heard there's something called startup
  509. catalyst within AIT. How does it
  510. function and uh how does the spin off
  511. from AIT? Are they do they actively uh
  512. uh help spinning off uh from AIT and how
  513. are the ecosystem working there?
  514. >> Right. Yeah. Yeah, I mean it's it's
  515. actually really wonderful because our uh
  516. managing director uh one of one of them
  517. we have three of them. Yeah. Uh shared
  518. responsibility for AIT, one of them is
  519. Alexander Spakovski. is um uh extremely
  520. supportive for uh startups and and
  521. spin-offs coming out of AIT because he
  522. strongly believes that uh research uh
  523. that we are developing amazing research
  524. projects anyways uh should go to the
  525. market and this is the this is part of
  526. the the DNA of the uh of the managing
  527. directors and that's the reason there is
  528. a very strong entrepreneurship uh
  529. support system built into a AIT and Hans
  530. Peter Blhovski is the head of
  531. entrepreneurship at IIT
  532. and he is uh uh currently um deeply
  533. involved in something called as founders
  534. journey. So the founders's journey
  535. begins actually at the beginning of a
  536. PhD at AIT. So PhD students when when
  537. when they start their PhD that's when
  538. the journey begins and AIT supports them
  539. throughout the whole journey until they
  540. become an entrepreneur and then they
  541. spin out of AIT. So this is the whole
  542. whole process. So there's at every step
  543. of the way there is support uh from the
  544. entrepreneurship team.
  545. >> Yeah. And I was asking the question
  546. because a lot of people just they know
  547. AIT is like something some institution a
  548. lot of smart people sitting over there
  549. like where it takes a bit longer to get
  550. there but [laughter]
  551. >> yeah it's a bit far away from
  552. >> the effort to come and visit
  553. >> but but uh but how how exactly you you
  554. kind of collaborate with industries and
  555. and the project that you work on how how
  556. how it exactly gets implemented by
  557. industries because you work together
  558. with a lot of industries right? Do you
  559. want to take a crack at that?
  560. >> Yes. I mean, of course, we work together
  561. a lot with our our industry partners as
  562. well and I think it's very good
  563. collaboration. So, we're learning a lot
  564. from them and they're also we're helping
  565. them find good solutions and I think the
  566. collaboration up until now has been very
  567. good for the most part and we're very
  568. excited to actually work closely with
  569. industry because that means we can solve
  570. real world problems. I mean, we're also
  571. quite advanced in terms of our
  572. technologies and in terms of research,
  573. but to actually see things being
  574. implemented and actually utilized, it
  575. makes makes all the difference. And I
  576. think that's what makes our jobs very
  577. exciting because we're very close to the
  578. real world as well. And of course, also
  579. with the new technologies keeping up
  580. >> from the perspective of research, so
  581. we're very much innovative, but at the
  582. same time, we're able to realize some of
  583. the solutions and at least knowing that
  584. we have a good impact.
  585. >> Yeah, absolutely. because AIT is uh a
  586. research organization, right? So we are
  587. not a university or educational
  588. institution. So we uh if you if you look
  589. at the technology readiness level,
  590. right? So from from let's say TRL1 to
  591. TRL 9 which is market.
  592. >> So we operate between four five six
  593. seven approximately. So we're closer to
  594. the industry than uh the universities
  595. are. And that's the reason the the first
  596. question that we always ask ourselves uh
  597. what does the industry need
  598. >> that's our starting point and then we
  599. build research projects together with
  600. the industry partners. So in our field
  601. we work very closely with a lot of
  602. distribution system operators of Austria
  603. and across Europe and uh they tell us
  604. what they need and then we perform
  605. research based on their needs. Of course
  606. we go way beyond because that's what
  607. being innovative is. Yeah. because they
  608. of course are already overloaded with
  609. the issues that they have.
  610. >> They're putting out fires every day. So
  611. we are trying to solve those immediate
  612. issues and of course look beyond that
  613. into the future as well and anticipate
  614. where the market is going and where the
  615. technology should follow. I just wanted
  616. to
  617. uh let or leave an idea that you
  618. mentioned you both mentioned before that
  619. now we are passing through uh from a
  620. system which was a black box. So now we
  621. are making it transparent box kind of or
  622. it has to be uh transparent and smart
  623. with full of lights and sensors and
  624. everything like for everyone. So it's uh
  625. super exciting and just to know your
  626. your feeling that how is today the the
  627. grid planning and how do you think that
  628. it could it could be or it should be. So
  629. to uh connect some of the the the the
  630. crumbs that I was you know throwing
  631. around. So uh Voltera a lot of it is on
  632. control algorithms realtime operation of
  633. the of the grid and right now we're
  634. talking about grid planning. So what's
  635. happening right now is there's a bit of
  636. a unification at the moment. So the uh
  637. the planning departments and planners
  638. want to move away from all this
  639. traditional planning approaches where
  640. looking at just the worst case scenario
  641. for example or reinforcing uh the
  642. traditional infrastructure like the
  643. cables uh underground cables overhead
  644. cables or transformers all this you know
  645. components right so we want to move away
  646. from from that and also to your point
  647. where you're just you know putting
  648. copper is not always a solution you're
  649. losing a lot of efficiency and leaving
  650. it on the table so we want to
  651. nonwired alternatives
  652. which are flexibilities.
  653. So that's that's what I talk about
  654. everything coming together. Yeah. So we
  655. want to use for example battery storage
  656. systems to support the grid instead of
  657. reinforcing the grid.
  658. >> Mhm.
  659. >> For example, in Vienna it's more
  660. expensive to dig the cable and get it
  661. out of the of the of the streets and put
  662. in new cable versus installing a small
  663. battery system that somehow supports the
  664. the local distribution grid. So this is
  665. what uh is the the evolution from the
  666. traditional planning approaches to this
  667. new paradigm where non-wired
  668. alternatives are becoming more
  669. predominant. Yeah. And this is exactly
  670. the platform that Rapson is going to be.
  671. So it's going to be a fully automated
  672. grid planning tool which considers both
  673. traditional planning approaches
  674. >> and non-word alternatives. So we can
  675. save up to 30%
  676. in total uh uh infrastructure costs that
  677. the uh the DSOs right now use per year.
  678. >> Wow.
  679. >> 30%. So we can reduce the capital costs
  680. by by a certain amount and then at the
  681. same time the OPEX is going to increase
  682. right because DSOs have some operational
  683. aspects now they need to be able to
  684. operate the battery and
  685. >> so we can combine both of them and play
  686. around with the simulation and the and
  687. the numbers. So we can save up to 30%
  688. totex
  689. >> across the board. So you so just to
  690. paraphrase let me know if it's right but
  691. we are transitioning from a predictable
  692. load with a black box that it was
  693. planned just um for long years because
  694. you could know what were going to happen
  695. and now we are with unpredictable load
  696. distributed generation and consumption.
  697. So your approach is that that the only
  698. way to address it is with AI or or some
  699. >> it's it's a combination
  700. >> automated so solutions
  701. >> the automation part is coming from the
  702. AI. This touches like multiple points
  703. because it's datadriven.
  704. >> So you can see patterns that uh you know
  705. typically you can't see in like
  706. traditional equations. So we can you
  707. know recognize patterns with a lot of
  708. data. We have a lot of smart meter data
  709. which we can use right now with the new
  710. regulation uh from from the DSOS from D
  711. control uh and this we can use to to
  712. leverage a lot of uh you know hidden uh
  713. background information that you
  714. typically can't see and at the same time
  715. AI can also automate a lot of processes
  716. where uh the the DSO planning department
  717. and the planning teams do not have to do
  718. the tedious work that they currently do
  719. by doing a lot of you know manual work a
  720. lot of manual simulations. So right now
  721. they can transition into becoming grid
  722. architects rather than actually doing
  723. you know very tedious simulations by
  724. hand. So this is what we want to
  725. transition transition to and this is
  726. what Rapson uh can can do that
  727. >> and could it be used also for for um
  728. molecules like gas pipelines or other
  729. kind of consumption or you are focused
  730. now only in electrical and electrons.
  731. Yeah, right now it's uh electricity
  732. because uh electricity is where the the
  733. major battleground is
  734. >> for energy transition. Yeah. And we are
  735. a startup so we need to pick [laughter]
  736. >> the uh the minimum viable product
  737. >> but in the future you are thinking into
  738. >> I mean we will go wherever our clients
  739. want us to go. So it's it's really
  740. market driven. So we really very closely
  741. listen to what our clients want.
  742. >> Yeah. You definitely would also a
  743. business developer at AAT.
  744. >> [laughter]
  745. >> Thank you.
  746. >> Hey uh and also Barbara like just g
  747. getting back to because you you also
  748. focus on e-mobility uh at AIT. So just
  749. wanted to understand that uh the load
  750. growth from housing and industry I think
  751. uh Daniel was touching upon before it's
  752. changing and we we had a couple of uh uh
  753. other startups like Podero which is also
  754. from Austria they they are looking into
  755. the flexibility assets uh
  756. >> uh from um and from the e-mobility also
  757. trying to get V2G
  758. >> like what when there was a similar
  759. projects which is between TUV and AIT
  760. and also a company that we know KW
  761. solution. what what what is the status
  762. of V2G currently and are they are they
  763. functional or are they already being
  764. able to integrate or uh I'm I'm sorry
  765. for going out of line but just wanted to
  766. understand
  767. >> yes I mean vehicle to grid is very much
  768. a research topic for everybody at the
  769. moment so I think it there's many open
  770. questions so for example even ranging
  771. from the technologies perspective from
  772. so for example even from the
  773. manufacturers of the vehicles themselves
  774. even down to how do we ensure what
  775. happens happens when the vehicles um are
  776. operating in vehicle to grid mode for
  777. example. But I think the biggest
  778. opportunity here at the moment is to see
  779. the aspects from vehicle to home where
  780. people can actually utilize their their
  781. own vehicles as a battery storage system
  782. that I mean that can be operated. But I
  783. mean there's many use cases that we're
  784. currently investigating especially when
  785. it comes to larger for example electric
  786. vehicles like the trucks and buses. What
  787. is the potential there? Because of
  788. course they're bigger batteries and have
  789. more a lot of potential there. And what
  790. does it mean for them? And I think this
  791. is also an interesting topic for us.
  792. Yeah.
  793. >> So is it one or another? You cannot have
  794. vehicle to grid and vehicle to home.
  795. >> Well, I mean the use case would mostly
  796. be from a vehicle to home perspective
  797. because then you can just basically use
  798. your own vehicle to supply your own
  799. household needs to some degree at least.
  800. So I mean we also have research
  801. questions coming into the perspective of
  802. what it actually means for using uh
  803. electric vehicles as a let's say a grid
  804. to load perspective and we have a few
  805. projects that are investigating it and
  806. it's also a very interesting topic but
  807. there's still many unknowns as well in
  808. this in this area. So I think it's
  809. something that we still have to keep our
  810. eyes on. I mean electric vehicles for
  811. example have a lot of potential there
  812. and I mean especially when it also comes
  813. to supporting the grid and also from a
  814. black start perspective because I mean
  815. identally they are basically batteries
  816. on on wheels basically. So [laughter]
  817. >> so yeah
  818. >> right but how does it u kind of alter
  819. the strategic model that you're working
  820. on with within smart charging or V2G
  821. like within the grid planning that you
  822. were telling as a context. So I mean
  823. we've also looked at it from a
  824. perspective of using optimized um let's
  825. say charging perspective and then moving
  826. towards what happens actually when we're
  827. using a vehicle to grid perspective. So
  828. it's more on the idea of how we can
  829. support the grid.
  830. >> Um but there's also yeah many qu open
  831. questions of what it means when we have
  832. optimized charging and who's actually
  833. benefiting is it the customer is it the
  834. DSO and so on and so on. there's a lot
  835. of questions open and how we actually
  836. going to manage it in the future um is
  837. still an open question especially here
  838. in Austria and in in in other parts of
  839. the world
  840. >> are some projects ongoing that we could
  841. ask you about in the future
  842. >> there also from the electric vehicle
  843. perspective um but yeah we haven't
  844. implemented anything in the field at the
  845. moment but it's still a lot in
  846. simulations and investigations yeah
  847. >> but currently uh V2G is not u
  848. operational as such it's just pretty
  849. much also in the project stages right
  850. like it's not getting implemented
  851. anywhere at the at a at a DSO level or
  852. at a local level.
  853. >> So the uh we had some projects
  854. investigating it and we had some
  855. demonstrations. Um there were a lot of
  856. ch a lot of challenges in that regard
  857. but we managed to get it. I think the
  858. project came at an earlier stage. Um it
  859. was called car to flex. It was it was a
  860. very successful project at the end also
  861. won many awards. So we were quite proud
  862. of it and that was led um by Tuv at the
  863. time. Um but yeah I mean it was yeah
  864. something that we investigated in a
  865. demonstration mode with different use
  866. cases. So again, it was more from an
  867. individual household perspective, car
  868. ownership as well as other use cases
  869. such as car sharing because that's also
  870. becoming a good topic at the moment when
  871. it comes to um how we want to use
  872. e-mobility and or mobility in general
  873. amongst the cities and then also from a
  874. fleet perspective and again from a fleet
  875. perspective here. We also see a lot of
  876. potential here where for example
  877. businesses want to electrify their
  878. fleets and then they can use these
  879. potentials like let's say for example
  880. overnight where you can have a vehicle
  881. to grid supporting system when the cars
  882. are not being used basically.
  883. >> Yeah. Just to understand the concept but
  884. uh car sharing you mean literally share
  885. the car and not own it.
  886. >> Yeah. So
  887. >> okay because I heard also like cars
  888. changing charging cards that's another
  889. word then car sharing in this context
  890. car sharing. the sharing cost basically
  891. many you have basically a fleet of
  892. vehicles that people can use to share
  893. amongst a community for example.
  894. >> Yeah. And I heard I've heard only that
  895. in only in Germany it's allowed now
  896. vehicle to grid and they are making
  897. tests but it's not spread uh yet and
  898. also you you both have been in this uh
  899. scalability and replicability analysis
  900. SR
  901. a sorry
  902. >> uh so why would you say that these
  903. analysis are so critical from a
  904. perspective that you are coming from a
  905. theorical
  906. and research approach into a real world
  907. problem if you could tell us more about
  908. it.
  909. >> I mean this is entirely barbarous topic.
  910. >> [laughter]
  911. >> Well, I mean it's both topic but it's an
  912. interesting topic and I think
  913. scalability and replicability analysis
  914. is a very important topic as you already
  915. mentioned and I mean looking just for
  916. example at the scalability so for
  917. example we might be able to develop
  918. certain solutions but what does that
  919. mean when we actually start implementing
  920. them in the real world at a larger scale
  921. so I mean I think adopting certain uh
  922. technologies and approaches also needs
  923. to be tested in such a way so we like to
  924. do scalability and replicability
  925. analysis um and what does that really
  926. mean and also looking at because the
  927. networks for example are very
  928. heterogenous and there's no
  929. one-izefits-all. So when we look at
  930. replica replicability analysis, what
  931. does it mean if we want to implement
  932. certain solutions in different types of
  933. grid for example in different regulatory
  934. um aspects or in different countries
  935. under different scenarios um and testing
  936. if this actually really works and how it
  937. works and how it how it differs for
  938. example. Now just uh thinking about we
  939. went to AIT one month ago and we were
  940. shown this uh EV charger which is for a
  941. project for India actually
  942. >> and
  943. >> low voltage
  944. >> low voltage I think yeah but it's in DC
  945. >> that was the the megawatt charger yeah
  946. which is one of the the winners for last
  947. year Cisco prize was it in the green
  948. >> so so you had to study the the other
  949. countries reality to to know how to
  950. implement it. Yeah. So I mean like I
  951. said every country has their own
  952. challenges and they might have their own
  953. regulations for example. They might have
  954. their own grid codes. Um also just from
  955. a a technical perspective they might
  956. have different challenges because the
  957. grids are different. They different
  958. voltages for example different ages more
  959. rural uh networks more urban networks
  960. depending on where you want to place
  961. these um charges for example in this
  962. case. Um but it's just in general with
  963. solutions because there's no
  964. oneizefits-all. I mean we try to make
  965. solutions that are applicable and
  966. modular for most cases but of course we
  967. also have to understand what the
  968. differences are if they are and how they
  969. actually impact our solutions and if
  970. they do or if they don't.
  971. >> Super cool. [laughter]
  972. >> Super cool.
  973. >> Just to understand the grids better as
  974. well. Um my contention is that as you're
  975. saying that the grid from different
  976. countries will be different as well. So
  977. within Europe there there might be some
  978. some sort of homogeneous
  979. uh genity within the the grid system.
  980. But when you have to compare that to
  981. let's say somewhere from Asia where the
  982. it's it's a bit younger grid let's call
  983. it like that. So
  984. >> I mean also different challenges exist
  985. in different countries. I mean just
  986. talking for example from a South African
  987. perspective there we also have see
  988. different challenges there. I mean there
  989. we have yeah different voltage levels
  990. for example the infrastructure might be
  991. different aged in a different way. We
  992. have different technologies. Um so
  993. there's challenges that differ from
  994. country to country and I mean that's one
  995. aspect where we see for example the
  996. ISCAN initiative which is the
  997. international smart grid action network
  998. and here we also collaborate with many
  999. countries across the world and
  1000. identifying what the challenges are
  1001. learning about their lessons learned for
  1002. different technologies we have different
  1003. working groups there in particular I'm
  1004. working in the working group six which
  1005. is also on transmission and distribution
  1006. grids and there again we allow knowledge
  1007. sharing activities to to happen and here
  1008. we can exchange and yeah share sharing
  1009. ideas
  1010. >> and you're the representative from AIT
  1011. or from Austria.
  1012. >> Um so I'm just one of the members of the
  1013. working group six and I'm running an
  1014. activity there on grid forming units in
  1015. particular but I mean there are many
  1016. different activities ongoing within
  1017. ISCAN itself. Yeah.
  1018. >> And and the the the the institute itself
  1019. the Ikan is for all countries.
  1020. >> Yeah. It's depends on the member states.
  1021. So every country can can apply and yeah
  1022. it's a little bit yeah complicated huh
  1023. >> that's exactly the uh the reason why
  1024. SRRA is so important and actually
  1025. Barbara also did the SR for this project
  1026. it's called gritcloud
  1027. >> mhm
  1028. >> yeah it's uh Aeronet project uh funded
  1029. by three funding organizations the
  1030. Austrian German as well as uh the
  1031. Turkish uh funding organization and we
  1032. had the uh I think the second biggest uh
  1033. distribution system operator in Turkey
  1034. uh GDC electric as part of the the
  1035. project 50 million customers. So it's
  1036. >> wow
  1037. >> quite large compared to the uh the
  1038. Austrian uh grid uh and distribution
  1039. companies.
  1040. >> Um so there we performed or Barbara and
  1041. a few other colleagues performed the
  1042. scalability and replicability analysis
  1043. to ensure that the solutions that were
  1044. developed in in Austria can actually be
  1045. extended to a country that is uh close
  1046. to Europe but is still beyond Europe. uh
  1047. to make sure that um these solutions can
  1048. actually be implemented and deployed uh
  1049. in Turkey.
  1050. >> Look, just putting more ingredients in
  1051. the soup, but I remember you mentioned
  1052. something that uh
  1053. >> you also take into account climate
  1054. changes into the electrical system to
  1055. address risks. For example,
  1056. um uh stronger winds or more
  1057. thunderstorms or more like
  1058. >> Absolutely. How how how do you address
  1059. all of this?
  1060. >> Yeah, it's it's a challenging task
  1061. because right now uh we are seeing that
  1062. uh some regions across the world uh and
  1063. especially right now in in in Turkey
  1064. where uh one of the pilots of the of the
  1065. project was it's u it's called the
  1066. Karabun Peninsula which is an hour away
  1067. from Ismir on the on the Mediterranean
  1068. Sea. That region is especially hit by
  1069. adverse uh climatic events like extreme
  1070. winds, thunderstorms,
  1071. um significant rain, uh and their their
  1072. entire distribution infrastructure is
  1073. above ground. So if it was underground,
  1074. then of course it would be affected
  1075. less, but they're above ground. Uh so
  1076. the cables are exposed and their the
  1077. distribution towers are exposed to all
  1078. this
  1079. >> the heat
  1080. >> adverse heat and then everything. It's
  1081. it's rain and then wind. Wind is
  1082. actually the major issue. wildfires.
  1083. >> And wildfires. Yeah, absolutely. Yeah.
  1084. And uh that's the reason we wanted to
  1085. install sensors on top of these
  1086. transmission or distribution towers and
  1087. to be able to do predictive maintenance.
  1088. So the goal is to be able to predict
  1089. >> and to figure out when a fault could
  1090. occur because of this climatic event. So
  1091. we track a lot of different data points
  1092. so that the the teams who are
  1093. responsible for going and fixing the uh
  1094. the grid if there is a breakdown. So
  1095. they're already prepared. So it's just
  1096. the point is to to minimize this this
  1097. downtime
  1098. >> as much as possible.
  1099. >> So that's the the whole point of the of
  1100. the project.
  1101. >> Just one following question because we
  1102. we read that you are
  1103. pretty much expert in to place or to um
  1104. estimate where to place the sensors. If
  1105. you have to place uh five sensors in a
  1106. load line for example
  1107. >> in a feeder.
  1108. >> Yeah.
  1109. >> And which sensor what do you sense
  1110. where? Yeah,
  1111. >> there's no obvious answer for this
  1112. question. It really depends on on the
  1113. specific uh feeder that you're looking
  1114. at. Yeah, because uh what we found out
  1115. on on many research projects a few years
  1116. ago and also continuing the work right
  1117. now. Also part of the Husco by the way
  1118. with the Volter solution is uh some of
  1119. our colleagues who are experts on on
  1120. data analytics and and AI. So they were
  1121. able to develop a a state estimation
  1122. method
  1123. >> which uh which proved that we actually
  1124. don't need uh measurement devices or
  1125. sensors at every single node in the
  1126. grid.
  1127. >> So we don't need need this. So we only
  1128. need it at some critical points in the
  1129. in the grid. So with with the help of
  1130. these minimal number of sensors you know
  1131. five six whatever it is
  1132. >> we can uh estimate the uh the voltages
  1133. the currents the active power the
  1134. reactive power and any other uh grid
  1135. parameter with the help of this this
  1136. small subset of of measurement devices.
  1137. >> So
  1138. >> and we're able to like prove this and
  1139. and that's where the the ideal sensor
  1140. placement is important.
  1141. >> Mhm.
  1142. >> Yeah. So we can algorithmically
  1143. calculate
  1144. um based on some methods that we have
  1145. where is this you know this ideal
  1146. location using which we can predict uh
  1147. the other uh points in the grid.
  1148. >> So it's kind of have a minimum cost
  1149. digital twin.
  1150. >> Exactly. So you're you're you don't need
  1151. to invest uh millions uh in in full
  1152. observability of the grid. This is not
  1153. needed. So you can do let's say 10% is
  1154. is the rule of thumb uh is enough to be
  1155. able to get full observability of the of
  1156. the grid.
  1157. >> Dynamic operating envelopes are a hot
  1158. topic. Barbara, your team is developing
  1159. method for them. How do they actually
  1160. change the conversation between DSO and
  1161. the proumer?
  1162. >> Yeah. So this is a very interesting
  1163. topic for us and I think it's also
  1164. coming up a lot in international um
  1165. perspective. So for example in Australia
  1166. they're very far advanced when it comes
  1167. to the operational envelope topics but
  1168. not to mention within our team itself we
  1169. also have many projects that are
  1170. investigating this topic and I think
  1171. it's very interesting because we also
  1172. want to see how we can adapt from this
  1173. so-called static approach to a more
  1174. dynamic approach to identifying when
  1175. users are utilizing the grid and at what
  1176. time of the day and how this can be used
  1177. by the DSOs in a flexible way. So for
  1178. example having a fixed connection point
  1179. versus having a more dynamic connection
  1180. point and how this changes is something
  1181. that needs to be investigated and
  1182. further developed within various
  1183. countries.
  1184. >> Yeah. Yeah. Energy management solutions
  1185. for home and and there are there whole
  1186. bunch of them within Austria within
  1187. within Europe right now. Do you think
  1188. that they will be uh going forward
  1189. within the utilities themselves them
  1190. having a software and then it's it's
  1191. like a more market driven question but
  1192. like they will die out or you think they
  1193. everyone will have a place because of
  1194. the decentralized system.
  1195. >> So let me let me understand this
  1196. question again. So you're asking me uh
  1197. uh so you have a lot of different uh
  1198. software developers and and you know
  1199. vendors supplying energy mining
  1200. solutions. Yeah, like there there many
  1201. many so flexibility there there's a
  1202. flexibility for the bigger assets there
  1203. flexibility for the home assets and
  1204. there there are many software with the
  1205. optimizing what what Barbara was
  1206. touching upon as well but going forward
  1207. this
  1208. >> at the grid level or at the house level
  1209. >> at the house level
  1210. >> you got to look at yeah behind the meter
  1211. >> behind the meter or
  1212. >> the meter one is a system level and one
  1213. is more like based on behind the meter
  1214. >> so so for example optimizing your
  1215. battery your you know rooftop solar
  1216. panel and your electric car.
  1217. >> Yeah, I think yes.
  1218. >> Yeah. And yes, there are a lot of them a
  1219. lot of you know companies and startups
  1220. >> and initiatives which have solutions for
  1221. this uh market.
  1222. >> Yeah. I mean uh because sometime I just
  1223. feel that uh they there's so many of uh
  1224. that optimization going on but uh on on
  1225. what level and
  1226. >> yeah I mean it's um it's it's it's an
  1227. interesting uh market to be in because
  1228. uh the uh barrier of entry is I would
  1229. say lower than the companies who do
  1230. system level optimization because that
  1231. needs a lot of expertise in part system
  1232. engineering in uh and in software
  1233. development and you know these two needs
  1234. to like these two domains need to like
  1235. coincide really well
  1236. >> and that's the reason solutions like
  1237. Wterara and Rapsson and all of that can
  1238. only come out of uh research
  1239. organizations like AIT or utilities
  1240. themselves or DSOs themselves. So all
  1241. the all the market participants and or
  1242. the market itself or the distribution
  1243. industry tends to be a bit more
  1244. challenging to enter and that's the
  1245. reason there are not many players in the
  1246. distribution energy management scale
  1247. >> and and you will also talk to the DSOS
  1248. directly you because
  1249. >> we always talk to the DSOs
  1250. >> and and it it will limit to them that if
  1251. they're going to extend the benefit of
  1252. the 30% and uh efficiency that you're
  1253. telling
  1254. >> that's the planning.
  1255. >> Okay.
  1256. >> Yeah. So the market of the grid planning
  1257. is different from the operation uh
  1258. software market
  1259. >> right. So so wter uh with the host price
  1260. that we won it's it's a control solution
  1261. for the operations
  1262. >> Mhm.
  1263. >> itself. So operation of different assets
  1264. in the grid and how we manage it and how
  1265. the voltages and then the loading of the
  1266. grid uh in is you know behaving in terms
  1267. of uh uh uh you know different
  1268. flexibilities that that are available
  1269. and how we can it's like a control
  1270. day-to-day operation of the of the grid
  1271. >> and Rapson is is a planning tool so it
  1272. helps DSO teams plan better for the
  1273. future.
  1274. >> Okay. And
  1275. >> two different market segments here.
  1276. >> Yeah.
  1277. >> Yeah. And in terms of in in the market
  1278. of grid operators in your opinion what
  1279. is the actually or or how actually helps
  1280. these LLMs in the control room?
  1281. >> Yeah.
  1282. >> For grid operators but where I mean how
  1283. actually help but and what is the
  1284. the border where the operators will say
  1285. okay LLM doesn't work here. This is
  1286. >> yeah I mean this is this is an
  1287. interesting question right so we're also
  1288. trying to answer this question um at IT
  1289. in our in our teams right now the uh
  1290. control room of uh of the DSOS's uh
  1291. let's say a scattera system or an
  1292. advanced distribution manage system um
  1293. and some of the biggest you know
  1294. companies in the energy industry uh they
  1295. have their own products in this regard
  1296. and these are extremely closed systems
  1297. because they're part of a critical
  1298. infrastructure so right Now no DSO in
  1299. Europe at least based on you know all
  1300. the DSOs that we have spoken to is
  1301. willing to or even interested in putting
  1302. any kind of AI or large language model
  1303. >> anywhere close to the scholar system
  1304. >> this is not happening
  1305. >> also any securities around like
  1306. >> this is a part of a critical
  1307. infrastructure so any decision that you
  1308. make it's it's super critical that that
  1309. it doesn't lead to some kind of adverse
  1310. effect on the grid yeah and AI is
  1311. blackbox so they don't know how the
  1312. decisions of AI and and what kind of
  1313. decisions it's making and how that would
  1314. affect the the grid. So this is not
  1315. happening in anytime future. Uh but
  1316. there there could be um some kind of
  1317. supervisory an advisory system which is
  1318. parallel to this kind of system which
  1319. doesn't have any kind of real control
  1320. over any of the assets
  1321. >> but just advising the the controllers
  1322. the operators of the of the grid in the
  1323. control room to take one action or the
  1324. other. So this is possible. there
  1325. already tools out there which provide
  1326. this kind of let's say supervisory and
  1327. advisory support
  1328. >> mhm
  1329. >> for the uh for the operators and then
  1330. they still have to have the expertise
  1331. which they do to say yes okay this is
  1332. the right decision uh which is coming
  1333. out of an AI LLM or any other AI tool uh
  1334. and if they want to execute this
  1335. decision in the real SCA system which
  1336. has a direct impact on the on the grid
  1337. or not
  1338. >> so we are changing one black box from
  1339. the electrical grid to a black books in
  1340. AI.
  1341. >> Yeah. [laughter]
  1342. >> Okay.
  1343. >> It was very interesting. Uh we asked
  1344. this question to also uh Philip Han from
  1345. Cyber Grid
  1346. >> and and uh and it was interesting. He
  1347. said he would always like a human to be
  1348. >> at the end of the levels.
  1349. >> Exactly.
  1350. >> He would not at least at this level he
  1351. would not entirely leave it to the
  1352. system.
  1353. >> Yeah.
  1354. >> Fully agree. [laughter]
  1355. >> Yeah. Fully agree. Barrett, you when you
  1356. pitch to offer digital services to TSOs
  1357. and DSOs, what are the honest interest
  1358. from these companies to acquire digital
  1359. services?
  1360. >> Mhm.
  1361. >> And what interest they show you
  1362. >> with this? Yeah, I mean right now a lot
  1363. of uh DSOs as well as TSOs are under a
  1364. lot of pressure to uh to adapt to this
  1365. changing uh world that we are uh
  1366. increasingly living in uh energy crisis
  1367. uh crisis in terms of grid complexity.
  1368. So right now the figures are up I think
  1369. five million devices in terms of
  1370. electric vehicles, photoable tech
  1371. panels, heat pumps, uh wind parks that
  1372. are uh waiting to be connected every
  1373. year and the grids are not prepared for
  1374. for this kind of uh uh uh uh transition.
  1375. Yeah. And um they are openly uh uh and
  1376. increasingly getting more interested in
  1377. this new approaches because uh we cannot
  1378. uh plan the grid with the tools of 1990s
  1379. to the plan the grid of the 2040s.
  1380. >> We agreed that it was built in the 70s
  1381. >> with the grid that was built in
  1382. [laughter] the 70s. Exactly. Yeah.
  1383. Exactly. So uh and that's the reason uh
  1384. increasingly seeing a lot of DSOs who
  1385. are extremely interested in those
  1386. digital tools this innovative tools that
  1387. are coming up which is amazing for us
  1388. right because we've been working on all
  1389. the solutions for the last 10 years and
  1390. and now the the pressure is really
  1391. mounting and then they want to see these
  1392. tools in reality they want a lot of lot
  1393. more pilot uh interest to actually see
  1394. it in real life because uh um of course
  1395. they want to make sure uh that the grid
  1396. is still stable to when they adopt this
  1397. the solutions So rightfully yeah. So
  1398. because a lot of uh people I myself in
  1399. the past have have uh repeatedly
  1400. mentioned that the DSOs are conservative
  1401. but now I'm after talking to them like a
  1402. lot in the last you know year or so.
  1403. >> I I I totally understand why this
  1404. conservatism comes from. Yeah. It's
  1405. >> because the grid is is in in Austria and
  1406. in Europe are one of the best in the
  1407. world. Yeah. The the the numbers speak
  1408. for themselves. You know 99.9998%
  1409. reliability is unbelievable. That kind
  1410. of mindset is still here because we
  1411. still want to maintain this reliability,
  1412. this level of reliability. Yeah. And I
  1413. totally get it now. Yeah.
  1414. >> And have you seen some kind of
  1415. difference like generationally like the
  1416. old experts from the old grid and now
  1417. with new professionals with new tools
  1418. what is the resistance and the
  1419. acceptability? It's every every
  1420. generation of of uh grid planner, grid
  1421. operator is understands the the issue
  1422. that we're facing right now and they
  1423. want to change and they want to adapt
  1424. new solutions. But the the main issue
  1425. that the DSOs are also facing is that
  1426. all the experience uh uh experienced
  1427. older generation professionals are
  1428. leaving and retiring.
  1429. >> Yeah.
  1430. >> So then what happens? Yeah. I mean
  1431. that's that's kind of a bit of a risk,
  1432. isn't it? Because if you're a grid
  1433. operator,
  1434. >> you have such experience the technicians
  1435. and professionals who are taking all
  1436. this knowledge that's basically not
  1437. written down anywhere. Yeah.
  1438. >> And then uh the new technicians are
  1439. coming in they they they simply cannot
  1440. you know comprehend because it's a very
  1441. complex system. So they need to like
  1442. impart this knowledge to the new
  1443. generation of technicians and then
  1444. retire. So this is a huge risk right now
  1445. in in Europe and uh it's you know
  1446. commonly known as tacet knowledge
  1447. >> in in AI space. So we weren't able to
  1448. like capture that somehow and then
  1449. deliver or pass it on to the next
  1450. generation of power system engineers.
  1451. >> Yeah. Well, recently we published in in
  1452. our social media uh research about
  1453. energy skills and in in the last two
  1454. years in Germany and and Austria and
  1455. it's very aligned with uh international
  1456. energy agency report that it's a lack of
  1457. professionals and skill in energy
  1458. sector. So we are addressing this in the
  1459. bridge. We are building um community
  1460. intelligence and we want to capture and
  1461. keep involved the old professional that
  1462. that are in this retiring period and to
  1463. accelerate the learning curve for the
  1464. new ones. Y
  1465. >> so yeah keep in touch with the because
  1466. we are going to bring some news about it
  1467. that we are building this uh energy
  1468. brain
  1469. >> and Barbara you're a task leader in IEA
  1470. ISCAN working group six that you earlier
  1471. mentioned so what role does ISCAN play
  1472. in bridging the gap between the national
  1473. grid initiative and the global knowledge
  1474. sharing and how much of the sharing
  1475. really happens because a lot of the time
  1476. like uh what is going on is that the
  1477. even who DASOS do to not share so much
  1478. of knowledge among themselves. So we we
  1479. are talking about knowledge sharing
  1480. between countries. So how much of the
  1481. knowledge
  1482. >> I mean of course it's not specific data
  1483. sharing um but it's more about
  1484. approaches and lessons learned from
  1485. implementing certain technologies. So I
  1486. think that's what the biggest benefit
  1487. again like I already mentioned as taking
  1488. aspects from use cases regulatory
  1489. sandbox aspects bringing together what
  1490. is been identified it's I mean it's a
  1491. wide range of topics. is not only the
  1492. from the technical perspective but also
  1493. from the adoption of actually people
  1494. from a a customer perspective what the
  1495. challenges are there and how to address
  1496. them and I think those lessons learned
  1497. are valuable especially to identify what
  1498. countries are doing what and how how
  1499. their solutions can be implemented so
  1500. it's more not it's I mean some in some
  1501. cases it can be very technical but also
  1502. on a policy level what policy measures
  1503. should be changed how to accelerate
  1504. certain adoption of certain technologies
  1505. >> yeah and Barbara you're also a national
  1506. expert
  1507. uh in cigarette C6 what what are the
  1508. emerging topics right now within the
  1509. community and what do you think is the
  1510. community underestimating
  1511. >> yes this is also a very big topic um I
  1512. think flexibility is still a hot topic
  1513. but also I see a lot of interest moving
  1514. towards this grid forming topic so also
  1515. identifying what it means for the DSOs
  1516. and also on the TSO level and I think
  1517. this is something that's very much
  1518. emerging it's underestimated because
  1519. there's still so many unknowns and we
  1520. not really sure of what's going to
  1521. happen in the future but it's something
  1522. that I see emerging and coming up as a
  1523. hot topic and it's something that should
  1524. be addressed.
  1525. >> What do you think about the current
  1526. increasing interest into having more
  1527. solutions in DC? I mean we were talking
  1528. about the electrical system is super
  1529. conservative and it has been worked with
  1530. AC for many many years and now we are
  1531. coming back with Edison using DC.
  1532. >> So Tesla for the win Edison is coming
  1533. back. Yeah.
  1534. >> Yeah. Exactly. So what do you think
  1535. about it?
  1536. >> Yeah. So definitely we also see that DC
  1537. is becoming a hot topic now and there's
  1538. also a lot of many aspects that are
  1539. still unknown and challenges. So for
  1540. example things like uh rectifier options
  1541. things like protection is still a big
  1542. question. Um but these technologies are
  1543. definitely coming up as a solution and
  1544. DSOS are interested in it seeing what is
  1545. what's going to happen. So for example
  1546. we have many use cases. So for example
  1547. again like the megawatt charging system
  1548. what it actually means for the grid
  1549. operators where they can also look at it
  1550. as an alternative to network
  1551. reinforcement because of course then we
  1552. can have a higher capacity transfer
  1553. within the grid and this topic for
  1554. example even ships aeroplanes uh DC hubs
  1555. and so on.
  1556. >> Um we're looking at data centers coming
  1557. up in the future and so on. Yeah.
  1558. >> Yeah. Actually we are having a session
  1559. in the forum that we are having in June
  1560. and one session will be only about data
  1561. centers and there is a company which is
  1562. >> calculating where to place them also
  1563. optimally. So it's yeah super exciting.
  1564. >> Yeah that's the uh grid planning teams
  1565. uh nightmare to to place data centers.
  1566. >> Yeah sure
  1567. >> and also of course DSOs to to approve
  1568. the the project and upgrade the grid.
  1569. Yeah.
  1570. >> Yeah. And that's a paradox right because
  1571. data centers are paying for the DSO but
  1572. they are bringing AI which is the
  1573. solution. So [laughter]
  1574. >> yes yeah for sure yeah the timing is the
  1575. the issue right so it's yeah we need the
  1576. data centers right now but the grid is
  1577. not ready and uh
  1578. >> plan better to have more data centers of
  1579. course yeah AI is is great and we need
  1580. more data centers for sure. Now we go to
  1581. the last part which is the quagfire
  1582. round and the third question is what
  1583. would you do with 1 billion euros to
  1584. accelerate energy transition.
  1585. >> Okay. So for me personally I think
  1586. electrification is still a big topic. So
  1587. this idea of energy poverty we see many
  1588. in many countries where many people
  1589. still don't have access to electricity
  1590. and I think putting the investment there
  1591. is also a big topic that we should be
  1592. considering. So for example like in
  1593. emerging countries where some people
  1594. don't even have the basic essential of
  1595. turning on a light bulb for example and
  1596. that's something we should address in
  1597. applying and allowing people to have
  1598. this idea of energy security.
  1599. >> Now Europe is electrified like in 22 23%
  1600. approach do you know or how much do you
  1601. think that Europe could be electrified?
  1602. No
  1603. >> that's a good yeah big question. I think
  1604. it also depends on industries and
  1605. updating the industries there for
  1606. example. But I think I mean a for
  1607. example and Europe in general is quite
  1608. established when it comes to
  1609. electrification especially on the
  1610. household level. But I think moving
  1611. forward to applying for different
  1612. industries as industry is growing. Um
  1613. also finding ways to make them more
  1614. efficient. I think that's a bigger topic
  1615. at the moment.
  1616. >> Yeah. But could it reach 30% any soon?
  1617. Because China, we went to China recently
  1618. last year and they are near to 40
  1619. >> electrified they say.
  1620. >> I mean I think I think these are
  1621. challenges that the DSOs are addressing
  1622. here within Europe. So I think it's very
  1623. much on their radar as well alongside
  1624. all the other challenges that they're
  1625. addressing. Yeah.
  1626. >> So electrification that's pretty much
  1627. that's my investment for the future.
  1628. Yeah.
  1629. >> You did you say 1 billion or 1 billion?
  1630. >> Wow. 1 billion is a very small amount.
  1631. You're not you're not
  1632. if you say if you say one trillion then
  1633. then we can talk.
  1634. >> Okay.
  1635. >> Yeah. Because because Europe Europe is
  1636. uh already investing 400 billion in the
  1637. next 10 years for electrification and uh
  1638. grid expansion and grid retrofit.
  1639. >> Oh wow. Yeah.
  1640. >> So the scale is 1 trillion. Yeah. Then
  1641. then I would put all of that into
  1642. carefully uh uh retrofitting and uh
  1643. reinforcing uh the grid so that we can
  1644. already uh integrate a lot more
  1645. renewable energy and and speed up the uh
  1646. energy transition
  1647. >> and unlock all the projects waiting in
  1648. the
  1649. >> exactly there's a lot of projects
  1650. waiting uh in in the in the queue. So to
  1651. already unlock this as quickly as
  1652. possible because this ties into the
  1653. whole energy sovereigntity, energy
  1654. poverty pretty much uh all the u the big
  1655. bets that have placed on energy
  1656. transition. So that would unlock
  1657. everything. That's where I would put the
  1658. one trillion
  1659. >> one trillion.
  1660. >> Yeah.
  1661. >> Cool.
  1662. >> If you had to pick one technology or
  1663. method that will reshape distribution
  1664. planning by 2030, what would it be? And
  1665. how much of the TSOS and DSL are into
  1666. network planning? Are they planning for
  1667. 2030 or they're planning further?
  1668. >> Yep. Yeah, that's a wonderful question.
  1669. Um, a super relevant question as well.
  1670. So, uh, uh, I think I spoke to 17 DSOs
  1671. in the last, let's say, three or four
  1672. months for, of course, Rapson, my
  1673. startup.
  1674. >> And, uh, uh, every single one of them
  1675. uh, mentioned to me that they're right
  1676. now so stressed with so many connection
  1677. requests that are getting at the moment.
  1678. So, they're really putting out fires. uh
  1679. every day to to be able to accommodate
  1680. all these new requests. Uh according to
  1681. the European regulation as well as a lot
  1682. of national uh regulations, they are
  1683. required to produce
  1684. >> mhm
  1685. >> uh a national development plan NDP every
  1686. two years which also includes uh future
  1687. planning as well. So how the grid will
  1688. evolve in the in the future and they do
  1689. this based on a lot of different
  1690. methodologies. You it really depends on
  1691. the on the DSO themselves. uh but they
  1692. uh or at least what I found out was they
  1693. absolutely uh would love to have a tool
  1694. that can automate a lot of these things
  1695. because they're of course you know also
  1696. hit by the same challenges that uh the
  1697. whole industry is is experiencing not a
  1698. lot of engineers who can uh help with uh
  1699. with you know doing all this very
  1700. tedious calculations
  1701. >> and Rapson can somehow automate it and
  1702. and by the way in Rapson uh we will have
  1703. uh just one button if you just click on
  1704. this button instantaneously you'll get a
  1705. fully developed network development
  1706. plan. Wow, that's nice.
  1707. >> And what would you say is the most
  1708. overhyped technology currently?
  1709. >> Blockchain is definitely over. So that I
  1710. can certainly uh say that for sure.
  1711. >> I mean it's overhyped for anything like
  1712. not [laughter]
  1713. >> Yeah. But it was especially high for
  1714. energy right and and also uh from the
  1715. grid uh point of view and that is
  1716. definitely not happening. Yeah. And in
  1717. the energy sector maybe the most
  1718. underrated concept that is now what
  1719. would you say that is the hidden gym?
  1720. >> So we have one of our uh PhDs within our
  1721. group uh uh especially specifically
  1722. focusing on how to uh speed up uh a load
  1723. flow method.
  1724. >> Okay.
  1725. >> Yeah. It's it's such a fundamental uh
  1726. tool that everybody uses in in power
  1727. system engineering. every single DSO TSO
  1728. every single day someone is you know
  1729. calculating a load flow
  1730. >> right and then there are uh standard
  1731. state-of-the-art methods
  1732. >> and uh our colleague Alper
  1733. uh he's working on speeding this up by
  1734. let's say a margin of 10
  1735. >> mh
  1736. >> and the implications are actually quite
  1737. significant with this just a 10 10 time
  1738. uh increase in in the conversion speed
  1739. of of a loadflow is extremely
  1740. significant because we are if you want
  1741. to use AI solutions and if you want to
  1742. uh calculate a lot of you know load
  1743. flows in loop this really adds up at the
  1744. European scale. So I would say uh a
  1745. humble loadflow tool to to make it
  1746. faster I think this is like super
  1747. underrated right now in my opinion needs
  1748. to get a bit more attention.
  1749. >> Yeah. If uh young electrical engineer
  1750. ask you today whether to go into grid
  1751. planning physical grid operation or AI
  1752. for energy what would you tell them? I
  1753. mean in general what advice you would
  1754. give to the young engineers getting into
  1755. this field? Yeah, I mean I think we've
  1756. identified already that there is a bit
  1757. of a shortage gap coming up in the
  1758. future and trying to encourage younger
  1759. generation to follow through and
  1760. becoming more engineering uh topics such
  1761. as the ones that you've already
  1762. mentioned and I think this is the big
  1763. challenge um trying to make power
  1764. systems look sexy is a bit yeah
  1765. challenging for us but I think going
  1766. forward this is the future and I think
  1767. everybody has a major role to play and I
  1768. think the sooner we address this the
  1769. better and everybody can be a superhero
  1770. in the energy transition and I think
  1771. that's what makes the And I think making
  1772. sure that the people are and the younger
  1773. generation is more aware of these topics
  1774. and how they can actually contribute to
  1775. creating this change is what makes it
  1776. more challenging and is the way forward
  1777. basically.
  1778. >> And you
  1779. um I would say education talking more
  1780. about uh u energy transition uh which is
  1781. happening already. I think uh Gen Z uh
  1782. is extremely climate conscious which is
  1783. very hopeful. Yeah, I'm very happy about
  1784. that.
  1785. >> Yeah. and uh they are uh extremely uh
  1786. more active compared to other
  1787. generations going out and doing
  1788. something about it which is also very
  1789. hopeful. Yeah. And uh I also see that
  1790. there is I would say an uptick in uh
  1791. interest in the engineering uh streams.
  1792. >> Okay. So in that note, thank you very
  1793. much for coming today. We are very
  1794. exciting also to having you both in the
  1795. forum in June. Barrett, you're going to
  1796. maybe moderate the biggest session. It's
  1797. It looks very good. Uh so yeah, thank
  1798. you very much. I hope you enjoyed it as
  1799. much as we did. Um looking forward for
  1800. seeing you in the forum and congrats
  1801. again for the Galardon. [clears throat]
  1802. >> Thank you so much. Yeah, it's always
  1803. wonderful to to talk to you guys and
  1804. also be back at the Energy Bridge
  1805. headquarters here in Vienna. Uh yeah. Uh
  1806. I'm I'm really looking forward to the uh
  1807. to the sessions that uh that you were
  1808. I'm still in a bit of a dark darkness
  1809. here, so I don't know what to expect,
  1810. but I'm sure it's going to be amazing.
  1811. >> Yes,
  1812. >> you will see.
  1813. >> Thank you very again.
  1814. >> And just from my side, thank you very
  1815. much for the invitation. It was very
  1816. exciting to be here and talk about my
  1817. favorite topics. [laughter] So I'm
  1818. looking forward to seeing what comes out
  1819. of this energy bridge um podcast in the
  1820. future. And yeah, I wish you guys all
  1821. the best.
  1822. >> Thank you very much, Barbara.
  1823. >> Thank you. And thanks for the comm to
  1824. the community for watching the episode
  1825. until the end. And keep tuned for next
  1826. interviews and for the [music] forum in
  1827. June. So see you. Chowo chiao.