Up to 70% of renewable connection requests could go unconnected if European grids are not reinforced over the next one to two decades — and the planning methods still in use make that worse by sizing for a worst-case day. Rao and Herndler make the case for automated planning that treats batteries and flexibility as alternatives to copper, claiming up to 30% off total infrastructure cost. On AI they are precise about the boundary: agents orchestrate the workflow, physics simulators do every calculation, and no European DSO will let a language model near a SCADA system.
Key metrics
by the numbers · 6- 70%share of renewable generation connection requests that could remain unconnected if grids are not reinforced
- 3%flat annual load growth traditionally assumed in worst-case grid planning
- 30%total infrastructure cost Rao expects automated planning with non-wired alternatives to save
- 10%rule-of-thumb share of grid nodes needing sensors to achieve full observability
- 99.9998%grid reliability in Austria and Europe, which Rao credits for DSO conservatism
- 400 billioneuros Europe is already investing over ten years in electrification, grid expansion and retrofit
Topics
8 tags- Duration
- 1h 05m
- Words
- 12.1k
- Questions
- 41
Timeline
12 chaptersThe transition happens underneath Vienna
Rao frames the episode: Europe has bet its competitiveness and sovereignty on the energy transition, and the power grid is the bottleneck.
Rapson, the spin-off
Rao is leaving AIT to commercialise eight years of research as an automated grid-planning company, named after the mathematician behind the Newton-Raphson method.
The connection queue
Up to 70% of requests to connect wind and solar could stay unconnected without reinforcement — the status quo, not a worst case.
What worst-case planning costs
Assuming a flat load growth and the worst summer and winter day leaves inefficiency on the table and puts copper where demand is not.
Agentic planning, with physics doing the maths
Agents orchestrate load flows and reinforcement algorithms and can draft the report, while every number comes from a physics simulator and every step is logged for audit.
Non-wired alternatives
Why a small battery supporting a local grid can beat digging up a Vienna street, and how planning tools must weigh both options.
Vehicle-to-grid versus vehicle-to-home
Herndler places V2G firmly in research — open questions from manufacturers down to operating mode — with vehicle-to-home and fleet depots the nearer opportunity.
Climate risk on exposed networks
A Turkish pilot on the Karaburun Peninsula, where overhead distribution meets extreme wind, storms and wildfire, and tower sensors enable predictive maintenance.
Where to put the sensors
State estimation means observability does not require a meter at every node; roughly 10% of nodes, placed algorithmically, is enough.
Why no LLM goes near the control room
SCADA is critical infrastructure and AI is a black box, so the realistic role is an advisory system beside it with an expert operator deciding.
Tacit knowledge walking out
Experienced grid staff are retiring with knowledge that was never written down, and new technicians cannot absorb a system this complex quickly.
Quick-fire round
Blockchain as the most overhyped, a faster load-flow solver as the most underrated, and why Rao thinks a billion euros is the wrong order of magnitude.
Key insights
5 takeaways- 01
The connection queue, not generation cost, is the binding constraint
Rao cites estimates from European institutions, research organisations and DSOs that without reinforcement over the next 10 to 20 years up to 70% of renewable connection requests will remain unconnected. The projects exist and the capital exists; the grid is what stops them, which is why he calls the grid the place the transition is actually decided.
- 02
Worst-case planning is why reinforcement money lands in the wrong places
Traditional practice assumes a flat load growth figure and plans against the worst summer and winter day. That over-reinforces areas without demand while under-serving hot spots, and Herndler's team instead does regionalised techno-economic analysis to tell DSOs where adoption of EVs or heat pumps will actually concentrate.
- 03
The credible AI architecture keeps the model away from the arithmetic
Rao is explicit that language models never compute: agents orchestrate load flows, optimal power flows and reinforcement algorithms, and the numbers come from physics simulators that DSOs have trusted for decades. Every step is recorded for audit so the resulting network development plan can be reviewed — reproducibility being the condition for using any of this on critical infrastructure.
- 04
DSO conservatism is earned, not cultural
Rao says he used to call DSOs conservative and no longer does. At 99.9998% reliability, the mindset protecting that number is rational, and it explains why operators want pilots and proof before adopting new tools — and why no European DSO is interested in AI anywhere near a SCADA system.
- 05
The staffing gap is a knowledge-transfer problem, not just a headcount one
Both guests return to the shortage of qualified network planners, but the sharper risk they name is tacit knowledge: experienced technicians are retiring with expertise that was never documented, and the replacements cannot quickly comprehend a system this complex. Automation is pitched partly as a response — freeing planners to work as grid architects rather than running simulations by hand.
Pull quotes
6 quotesWhy 8 years? You can ask yourselves because that's what it takes.
So we will not use LLMs to compute anything.
We cannot plan the grid with the tools of 1990s to the plan the grid of the 2040s.
99.9998% reliability is unbelievable.
Blockchain is definitely over.
Everybody can be a superhero in the energy transition
- Welcome to a new episode here in the
- energy bridge. Uh today we have the
- pleasure to have Barat and Barbara from
- Austria Institute of Technology AIT. In
- this episode we have many surprises and
- the first one is that Barat is going to
- make the context of this episode what is
- important what we are going to talk
- about. So pleased about that.
- >> Really good to be uh back
- with uh with you guys the energy bridge
- here in Vienna actually. Beautiful sunny
- afternoon.
- >> Yeah, finally it's wonderful.
- >> Spring starting finally.
- >> Yeah. I am Paratra. uh with Austrian
- Institute of Technology in the group of
- power system digitalization uh as well
- as uh soon to be a bigger group
- combining two different groups which is
- power system planning or operation which
- will be merged into power systemization.
- I think the new name is power system
- planning operation and digitization.
- >> Yeah, we're still discussing the name.
- >> All right. Okay. [laughter]
- Yeah. Uh I would love to provide the uh
- the context uh for today. So the energy
- transition that uh that that's happening
- right now uh Europe is going all in. So
- Europe is pretty much fully invested in
- energy transition. So we are betting our
- our future our economy uh for energy
- transition our competitiveness as well
- as our sovereigntity. So we need to make
- sure that uh we can deliver this and uh
- right now uh in the parliaments in
- boardrooms in in in the editorial boards
- of newspapers everybody is discussing
- about exactly this topic. How can we
- deliver energy transition without
- bankrupting ourselves? Right now I want
- to make a a humble statement that uh
- energy transition
- is going to happen in the power grid.
- >> So it happens right underneath us here
- in Vienna kilometer by kilometer. So
- this is where the energy transition is
- happening. This is the bottleneck. So
- this is the context that I'd love to to
- talk more about today with with the
- three of you. So just on that note um
- very welcome guys and to you as well
- Barbara you are very summerlike today
- and yeah completely how the weather is
- in in Vienna but uh thank you very much
- guys and and also for making the context
- >> let's dive in deeper but uh before we
- dive in deeper into the the the big
- context that you made we would love to
- know about you please introduce yourself
- about your role and uh how you have come
- across doing what you do currently. We
- we start with Barbara.
- >> So, good afternoon everybody and thank
- you for having me here today. I'm very
- excited to be here. This is my first
- podcast. So, let's see how this
- develops. But yeah, so um as I already
- mentioned, my name is Barbara. I was
- born and raised in South Africa, so a
- long way from home, but I've found
- myself here in Austria um with a lot of
- new opportunities and a lot of new
- challenges. I'm very happy to be here.
- So my current context um in the role of
- the power system and planning and
- operation at AIT I'm a research
- engineer.
- >> Um I also focus a lot on the e-mobility
- topics looking at various interactions
- between the DSOS the TSOS also um
- focusing on how we can integrate new
- technologies with into the power grid
- and yeah also trying to serve as a good
- um project manager together with my
- teams.
- >> And you you did your study at in South
- Africa.
- >> Yes that's correct. So I was born and
- raised Johannesburg but uh studied in
- Cape Town. So
- >> and what did you study your initial
- study?
- >> So electrical engineering. So I'm very
- much a power systems engineer. Yeah.
- Hardcore engineering. [laughter]
- >> Yeah.
- >> We can go deep.
- >> Yeah. And and you Barrett?
- >> Yeah. I already uh mentioned uh about my
- role uh at uh within the group of power
- systemization. Uh I'm a scientist and
- business developer there. So um I do a
- bit of project management research
- projects as well as try to commercialize
- the uh the solutions that uh we produce
- across many research projects um in our
- entire team. Uh the bigger team or
- bigger group is called power and
- renewable gas systems. So it's uh it's
- both electrical energy system as well as
- uh renewable gas system. So it's it's
- both. So it's quite a large group uh
- that we have at at AIT. And my
- background is in power system
- engineering. Um so I have a bachelor's,
- masters and PhD in in power system
- engineering. 10 years of experience a
- lot of uh different uh Austrian European
- international level projects. So right
- now I'm in the process of uh actually
- quitting AIT.
- So creating my own spin-off and uh
- hopefully next year spin out of AIT and
- create a a company of my own.
- >> Yeah, that's the other that was other of
- the surprises. Today we are breaching
- academia, industry, policy makers and
- innovators within energy sector and you
- are pretty much both of you reaching
- from the research um bringing solution
- innovative solutions to the industry and
- we have something here on the table
- which is the Hushka prize that um
- Barbara won with your team last year and
- recently yesterday was right
- >> the day before yesterday.
- >> The day before yesterday you won it
- again. So we have some applauses
- [laughter]
- but uh yeah if if you can tell us uh a
- bit what is the prize about and you can
- tell us about the spin-off of your own
- startup out of 80.
- >> Yeah we were very humbled uh to receive
- the the award for 2026. Uh so for the
- project uh called Wterara. So Wterara is
- a research innovative
- that was within AIT. So it was part of
- many research projects across uh eight
- years approximately uh with many funded
- projects um uh national Austrian as well
- as European projects and also one
- international project. So uh we were
- able to fully develop the solution from
- let's say TRL one like the fundamental
- idea that we came up with uh to right
- now TRL 7 or 8 very close to the to the
- market. So we're able to fully develop
- this. Why 8 years? You can ask
- yourselves because that's what it takes.
- Yeah. Because this is a very difficult
- field. We need to be able to do it
- correctly. Develop the solutions that is
- trustworthy to our clients who are
- distribution system operators
- >> who manage a critical infrastructure.
- >> So we we have to make sure that
- everything works perfectly and it needs
- to be meticulous and it is a slow
- process unfortunately. That's how it is.
- Yeah. To to come to a point where you
- can sell it and then actually put it in
- the real world and we need to make sure
- that everything is is is correct and
- that's the reason it takes a lot of
- time. Yeah. And regarding the spin-off
- um so the spin-off is going to be called
- Rapson. So named after Joseph Rapson
- who's a mathematician.
- >> He's known for Newton Rapson method
- which is
- >> Yeah, I remember it. Yeah. which is the
- the most important uh mathematical tool
- for computing uh load flows or power
- flows in in power system and Newton is
- quite famous Rapson actually not not so
- much not very well known so we decided
- that we would give him give a bit of a
- homage
- >> to just rapson and uh that's why it's
- called Rapson and um I would say a lot
- of tools that were part of Voltera will
- be taken into Rapson and and we'll
- create a commercial solution out of it
- and hopefully it'll help a lot of our
- clients who are distribution system
- operators of Austria, Europe and also of
- course worldwide.
- >> Amazing. And and for you Barbara, what
- was the project about and and and you
- and [laughter]
- which among your team was working on the
- project?
- >> Um so basically it was actually last
- year um that but with the project is
- still ongoing. So it's actually called
- the Medusa project which focuses on the
- development of a multimegawatt charging
- system and how to integrate that within
- the power system as well. So we also see
- that the directions of uh e-mobility for
- electric vehicles not only for the
- vehicles themselves but also towards
- trucks and buses.
- >> So this is also becoming quite a big
- challenge and the industry is moving
- quite fast in this regard. Um but also
- what does it actually mean for the power
- system and in this project we're
- developing the solutions and
- investigating how to integrated in a
- better way. At the beginning as Barat
- mentioned it's uh we are navigating in
- this energy transition and to deploy
- more copper is much slower than utilize
- the grid more smartly. So you are using
- AI to do that and also Barbara you
- mentioned that you are um working in the
- grid planning. So how do you take into
- account these new solutions to how do
- you plan a grid?
- >> Yeah. So this is quite a challenging
- question and it's not a simple answer.
- >> So I mean I think every like system
- operator has their own approaches
- because the as we already know the
- networks are very heterogenous. So each
- let's say system operator has their own
- unique challenges. Um but I mean at the
- same time the energy transition is
- transitioning into a way where we have
- to accept and adopt new technologies
- such as photovalttaic electric vehicles
- and of course heat pumps just to mention
- a few
- >> and I mean I think all DSLRs are seeing
- this challenge and I think connection
- times are also becoming a big problem.
- So waiting times, how to connect in in a
- fast way. Um we see that waiting times
- are accelerating because to keep up with
- this technology, I mean it's not it's
- not very linear. It's like accelerated
- in an exponential level. And I think
- it's good that people are accepting the
- new technologies and adopting them, but
- at the same time it's very challenging
- for our DSOs.
- >> Yeah. And no a following question that
- you mentioned permitting because uh I I
- also obtain permits in Chile for for
- projects. So I know the pain of the
- whole process and
- >> and now Barrett you mentioned in the
- last forum um that the grid operators
- use the worst case scenario to give
- permits
- >> but what would it be if to this approach
- would it be
- >> optimized with AI forecast or whatever
- how do you see that
- >> yeah I mean that's that's a valid
- question um so right now just again uh
- to to take a step back a bit uh so right
- now uh so we can estimate or eur
- European and institutions as well as a
- lot of research organizations and also
- DSOs are estimating that if we don't
- upgrade the grid in the next 10 15 20
- years up to 70% of all the requests for
- renewable energy generations for example
- wind parks solar parks will be uh
- remained unconnected so you cannot
- connect them because the grids are not
- ready right now
- >> so we have% below the
- >> so 70% of of connections could just stay
- there and then the projects cannot be
- realized
- because the grid is not ready. This is
- the the status right now we're in at the
- moment up to 70% if you don't reinforce
- the grid.
- >> Yeah. Yeah, and that's where all this
- you know challenges about uh uh the the
- permission and then the connection
- requests comes into picture because you
- want to be able to very quickly perform
- the simulations and and you know provide
- accurate information to DSOs where to re
- reinvest the grid or reinforce the grid
- and when to reinforce the grid and how
- how much to reinforce the grid because
- there's only a certain amount of uh
- funding that goes every year to grid
- reinforcement. you want to make make
- sure that it goes in in the right
- places,
- >> right? So that's super critical and you
- don't want to re reinforce the grid
- where there is not a lot of demand and
- that's where the linearity comes into
- the picture
- >> because right now uh traditionally grid
- reinforcement is done with just by
- considering uh you know let's say 3%
- load growth in a certain region and this
- is you know it's called worst case
- planning. You just assume that uh there
- is the worst day in summer and worst day
- in winter and then you do you know
- planning based on that. Mhm.
- >> Yeah. This is a lot of inefficiency just
- sitting on the table. You're
- reinvesting. You're spending a lot of
- you know again copper and uh you can do
- it better and more intelligently. I
- think this is where you know one of the
- projects that Barbara was part of and
- and her team in power system planning
- and operation uh they did it the right
- way.
- >> So we're also looking at ideas of more
- like in a way of regionalization
- approaches.
- example identifying where the hot spots
- would be for to certain technologies and
- prioritizing where the reinforcement
- requirements actually are. So I mean
- identifying certain areas for example
- which we might foresee a higher um
- adoption of electric vehicles for
- example in the future what the demands
- there would be in terms of network
- reinforcement and how much it would
- actually cost. So we can do this so to
- say a technoeconomic analysis of how um
- these approaches should be done and help
- the DSOS prioritize what their needs are
- and where. But it's not only the fact
- that it's just the where the funding
- comes from. It's also about the
- manpower. So I mean also it also needs
- some effort from personnel. Um not
- everybody can be everywhere at once but
- this again helps to identify where the
- priority areas are.
- >> You both don't work in the same team
- right or you it's like a same umbrella
- team that you work in.
- >> So when we combine uh these two groups
- she's going to be my boss. [laughter]
- >> But we work very closely together. So I
- mean within power system planning and
- operation we cannot achieve it without
- the digitalization aspect. So I think
- the the two are very much overlapping.
- We have many overlapping projects
- together publications and so on. So I
- think it's it's a good combination and
- it would be a nice way move forward to
- combine the two teams.
- >> That's what I wanted to understand as
- well like how exactly a function and how
- exactly you guys complement each other
- in your function and in your projects.
- >> Yeah. Uh it's a very uh uh very close uh
- collaboration between power system
- planning or operation and power system
- digitalization groups here at IIT
- because digitalization is key in pretty
- much every field right now.
- >> Mhm.
- >> And especially in in power system uh
- planning and operation. So that's where
- a lot of projects Walter is the best
- example right. So we have a lot of AI
- going AI solutions in Walter
- >> and and we work closely with the
- colleagues from the Barbara's team.
- Yeah. to to realize the uh because they
- bring the power system expertise and
- then we bring the power expertise of
- course with the AI and visualization
- expertise.
- >> Barrett, what could you tell us about uh
- the interaction or the intersection
- between AI and network planning for
- example?
- >> Yeah, I mean that's uh that's something
- that we are uh looking into at the
- moment especially with the all this uh
- agentic approaches where uh the the name
- of the game is automation. And this also
- ties into something that I mentioned
- earlier uh also the industry issues with
- uh with not enough you know people who
- are uh experienced and expert in this
- topics uh or mainly network planners.
- Yeah. Uh and with uh with this agentic
- approach we can uh you know calculate
- multiple a multitude of you know tools.
- So for example, if you want to do
- network planning, you need to be able to
- first run a load flow, right? You need
- to run like a few more load flows to
- figure out what the uh what the issue is
- in the grid and then you need to run an
- optimal reinforcement algorithm for
- example. So all of these are very
- mathematical and uh it needs a lot of
- you know uh um input configuration and
- all of this can be fully automated with
- AI. So this is what we're trying to do
- with Rapson as well. Mhm.
- >> So where we have like a fully end toend
- automated uh tool where a genetic
- systems orchestrates different
- simulations that that need to
- [clears throat] run and ultimately can
- also write a report for you. So that's
- that's that's the whole automation uh
- that we are trying to bring to uh grid
- planning and then AIS can really help
- with this. Yeah. And of course we need
- to be careful. Yeah. Every step needs to
- be uh uh recorded for audits and
- reviews. Yeah. to make sure that the the
- network development plan that comes out
- of this uh uh tool is actually valid.
- Yeah. And that's the reason LLMs never
- do any kind of computation. So all the
- numbers everything that are computed are
- backed by physics simulators. So physics
- inform simulation.
- >> Yeah. They are not very good in maths
- >> of course. [laughter] So we will not use
- LLMs to compute anything. So it's it's
- traditional power system tools
- >> like optimal power flow load flow behind
- which actually does the calculations.
- >> So the agents only call those
- simulations and then orchestrate the
- whole flow
- >> and that's the reason we can ensure that
- the uh the answers are are actually
- accurate
- >> and and you would say that the AI based
- stimulator the the math based stimulator
- would be better than the AI based
- stimulator in a way
- >> all the time of course. Yeah because
- also the trust is is important.
- >> Yes. because the grid operators trust
- these tools that have been around for 50
- 60 years.
- >> Mhm.
- >> Yeah. And then we uh cannot assure that
- the uh the results coming out of an AI
- LLM is accurate which is obvious and
- this this we know it elucidates a lot.
- Yeah. And uh this is critical
- infrastructure. So we need to be able to
- prove and reproducible results is is the
- key.
- >> And and at AIT uh do you have a
- specialized AI team or that's like
- everyone is working?
- Yeah. I mean um AIT is part of um uh I
- >> mean it's AIT [laughter]
- factory.
- >> AI factory. Exactly. Exactly. So uh
- there's a group called uh digital safety
- and security. So they are responsible
- for the uh AIAT which is the AI factory
- of Austria.
- >> Uh it's still under construction at the
- moment. um and they are responsible for
- pretty much uh boosting uh the entire AI
- industry of Austria. So any startup any
- industry uh uh uh you know players want
- to develop and and use compute
- infrastructure so this is possible to
- get from the air factory
- >> and AIT is the uh founding member of a
- >> yeah it's a leading leading member uh
- for the infrastructure as well as a lot
- of you know services coming out of the
- uh the air factory but every single
- research institution university are
- stakeholders of of the air factory
- >> but you you have been able to uh start a
- company within AIT. Uh would you walk us
- through how does uh the whole
- entrepreneurship system or a catalyst? I
- heard there's something called startup
- catalyst within AIT. How does it
- function and uh how does the spin off
- from AIT? Are they do they actively uh
- uh help spinning off uh from AIT and how
- are the ecosystem working there?
- >> Right. Yeah. Yeah, I mean it's it's
- actually really wonderful because our uh
- managing director uh one of one of them
- we have three of them. Yeah. Uh shared
- responsibility for AIT, one of them is
- Alexander Spakovski. is um uh extremely
- supportive for uh startups and and
- spin-offs coming out of AIT because he
- strongly believes that uh research uh
- that we are developing amazing research
- projects anyways uh should go to the
- market and this is the this is part of
- the the DNA of the uh of the managing
- directors and that's the reason there is
- a very strong entrepreneurship uh
- support system built into a AIT and Hans
- Peter Blhovski is the head of
- entrepreneurship at IIT
- and he is uh uh currently um deeply
- involved in something called as founders
- journey. So the founders's journey
- begins actually at the beginning of a
- PhD at AIT. So PhD students when when
- when they start their PhD that's when
- the journey begins and AIT supports them
- throughout the whole journey until they
- become an entrepreneur and then they
- spin out of AIT. So this is the whole
- whole process. So there's at every step
- of the way there is support uh from the
- entrepreneurship team.
- >> Yeah. And I was asking the question
- because a lot of people just they know
- AIT is like something some institution a
- lot of smart people sitting over there
- like where it takes a bit longer to get
- there but [laughter]
- >> yeah it's a bit far away from
- >> the effort to come and visit
- >> but but uh but how how exactly you you
- kind of collaborate with industries and
- and the project that you work on how how
- how it exactly gets implemented by
- industries because you work together
- with a lot of industries right? Do you
- want to take a crack at that?
- >> Yes. I mean, of course, we work together
- a lot with our our industry partners as
- well and I think it's very good
- collaboration. So, we're learning a lot
- from them and they're also we're helping
- them find good solutions and I think the
- collaboration up until now has been very
- good for the most part and we're very
- excited to actually work closely with
- industry because that means we can solve
- real world problems. I mean, we're also
- quite advanced in terms of our
- technologies and in terms of research,
- but to actually see things being
- implemented and actually utilized, it
- makes makes all the difference. And I
- think that's what makes our jobs very
- exciting because we're very close to the
- real world as well. And of course, also
- with the new technologies keeping up
- >> from the perspective of research, so
- we're very much innovative, but at the
- same time, we're able to realize some of
- the solutions and at least knowing that
- we have a good impact.
- >> Yeah, absolutely. because AIT is uh a
- research organization, right? So we are
- not a university or educational
- institution. So we uh if you if you look
- at the technology readiness level,
- right? So from from let's say TRL1 to
- TRL 9 which is market.
- >> So we operate between four five six
- seven approximately. So we're closer to
- the industry than uh the universities
- are. And that's the reason the the first
- question that we always ask ourselves uh
- what does the industry need
- >> that's our starting point and then we
- build research projects together with
- the industry partners. So in our field
- we work very closely with a lot of
- distribution system operators of Austria
- and across Europe and uh they tell us
- what they need and then we perform
- research based on their needs. Of course
- we go way beyond because that's what
- being innovative is. Yeah. because they
- of course are already overloaded with
- the issues that they have.
- >> They're putting out fires every day. So
- we are trying to solve those immediate
- issues and of course look beyond that
- into the future as well and anticipate
- where the market is going and where the
- technology should follow. I just wanted
- to
- uh let or leave an idea that you
- mentioned you both mentioned before that
- now we are passing through uh from a
- system which was a black box. So now we
- are making it transparent box kind of or
- it has to be uh transparent and smart
- with full of lights and sensors and
- everything like for everyone. So it's uh
- super exciting and just to know your
- your feeling that how is today the the
- grid planning and how do you think that
- it could it could be or it should be. So
- to uh connect some of the the the the
- crumbs that I was you know throwing
- around. So uh Voltera a lot of it is on
- control algorithms realtime operation of
- the of the grid and right now we're
- talking about grid planning. So what's
- happening right now is there's a bit of
- a unification at the moment. So the uh
- the planning departments and planners
- want to move away from all this
- traditional planning approaches where
- looking at just the worst case scenario
- for example or reinforcing uh the
- traditional infrastructure like the
- cables uh underground cables overhead
- cables or transformers all this you know
- components right so we want to move away
- from from that and also to your point
- where you're just you know putting
- copper is not always a solution you're
- losing a lot of efficiency and leaving
- it on the table so we want to
- nonwired alternatives
- which are flexibilities.
- So that's that's what I talk about
- everything coming together. Yeah. So we
- want to use for example battery storage
- systems to support the grid instead of
- reinforcing the grid.
- >> Mhm.
- >> For example, in Vienna it's more
- expensive to dig the cable and get it
- out of the of the of the streets and put
- in new cable versus installing a small
- battery system that somehow supports the
- the local distribution grid. So this is
- what uh is the the evolution from the
- traditional planning approaches to this
- new paradigm where non-wired
- alternatives are becoming more
- predominant. Yeah. And this is exactly
- the platform that Rapson is going to be.
- So it's going to be a fully automated
- grid planning tool which considers both
- traditional planning approaches
- >> and non-word alternatives. So we can
- save up to 30%
- in total uh uh infrastructure costs that
- the uh the DSOs right now use per year.
- >> Wow.
- >> 30%. So we can reduce the capital costs
- by by a certain amount and then at the
- same time the OPEX is going to increase
- right because DSOs have some operational
- aspects now they need to be able to
- operate the battery and
- >> so we can combine both of them and play
- around with the simulation and the and
- the numbers. So we can save up to 30%
- totex
- >> across the board. So you so just to
- paraphrase let me know if it's right but
- we are transitioning from a predictable
- load with a black box that it was
- planned just um for long years because
- you could know what were going to happen
- and now we are with unpredictable load
- distributed generation and consumption.
- So your approach is that that the only
- way to address it is with AI or or some
- >> it's it's a combination
- >> automated so solutions
- >> the automation part is coming from the
- AI. This touches like multiple points
- because it's datadriven.
- >> So you can see patterns that uh you know
- typically you can't see in like
- traditional equations. So we can you
- know recognize patterns with a lot of
- data. We have a lot of smart meter data
- which we can use right now with the new
- regulation uh from from the DSOS from D
- control uh and this we can use to to
- leverage a lot of uh you know hidden uh
- background information that you
- typically can't see and at the same time
- AI can also automate a lot of processes
- where uh the the DSO planning department
- and the planning teams do not have to do
- the tedious work that they currently do
- by doing a lot of you know manual work a
- lot of manual simulations. So right now
- they can transition into becoming grid
- architects rather than actually doing
- you know very tedious simulations by
- hand. So this is what we want to
- transition transition to and this is
- what Rapson uh can can do that
- >> and could it be used also for for um
- molecules like gas pipelines or other
- kind of consumption or you are focused
- now only in electrical and electrons.
- Yeah, right now it's uh electricity
- because uh electricity is where the the
- major battleground is
- >> for energy transition. Yeah. And we are
- a startup so we need to pick [laughter]
- >> the uh the minimum viable product
- >> but in the future you are thinking into
- >> I mean we will go wherever our clients
- want us to go. So it's it's really
- market driven. So we really very closely
- listen to what our clients want.
- >> Yeah. You definitely would also a
- business developer at AAT.
- >> [laughter]
- >> Thank you.
- >> Hey uh and also Barbara like just g
- getting back to because you you also
- focus on e-mobility uh at AIT. So just
- wanted to understand that uh the load
- growth from housing and industry I think
- uh Daniel was touching upon before it's
- changing and we we had a couple of uh uh
- other startups like Podero which is also
- from Austria they they are looking into
- the flexibility assets uh
- >> uh from um and from the e-mobility also
- trying to get V2G
- >> like what when there was a similar
- projects which is between TUV and AIT
- and also a company that we know KW
- solution. what what what is the status
- of V2G currently and are they are they
- functional or are they already being
- able to integrate or uh I'm I'm sorry
- for going out of line but just wanted to
- understand
- >> yes I mean vehicle to grid is very much
- a research topic for everybody at the
- moment so I think it there's many open
- questions so for example even ranging
- from the technologies perspective from
- so for example even from the
- manufacturers of the vehicles themselves
- even down to how do we ensure what
- happens happens when the vehicles um are
- operating in vehicle to grid mode for
- example. But I think the biggest
- opportunity here at the moment is to see
- the aspects from vehicle to home where
- people can actually utilize their their
- own vehicles as a battery storage system
- that I mean that can be operated. But I
- mean there's many use cases that we're
- currently investigating especially when
- it comes to larger for example electric
- vehicles like the trucks and buses. What
- is the potential there? Because of
- course they're bigger batteries and have
- more a lot of potential there. And what
- does it mean for them? And I think this
- is also an interesting topic for us.
- Yeah.
- >> So is it one or another? You cannot have
- vehicle to grid and vehicle to home.
- >> Well, I mean the use case would mostly
- be from a vehicle to home perspective
- because then you can just basically use
- your own vehicle to supply your own
- household needs to some degree at least.
- So I mean we also have research
- questions coming into the perspective of
- what it actually means for using uh
- electric vehicles as a let's say a grid
- to load perspective and we have a few
- projects that are investigating it and
- it's also a very interesting topic but
- there's still many unknowns as well in
- this in this area. So I think it's
- something that we still have to keep our
- eyes on. I mean electric vehicles for
- example have a lot of potential there
- and I mean especially when it also comes
- to supporting the grid and also from a
- black start perspective because I mean
- identally they are basically batteries
- on on wheels basically. So [laughter]
- >> so yeah
- >> right but how does it u kind of alter
- the strategic model that you're working
- on with within smart charging or V2G
- like within the grid planning that you
- were telling as a context. So I mean
- we've also looked at it from a
- perspective of using optimized um let's
- say charging perspective and then moving
- towards what happens actually when we're
- using a vehicle to grid perspective. So
- it's more on the idea of how we can
- support the grid.
- >> Um but there's also yeah many qu open
- questions of what it means when we have
- optimized charging and who's actually
- benefiting is it the customer is it the
- DSO and so on and so on. there's a lot
- of questions open and how we actually
- going to manage it in the future um is
- still an open question especially here
- in Austria and in in in other parts of
- the world
- >> are some projects ongoing that we could
- ask you about in the future
- >> there also from the electric vehicle
- perspective um but yeah we haven't
- implemented anything in the field at the
- moment but it's still a lot in
- simulations and investigations yeah
- >> but currently uh V2G is not u
- operational as such it's just pretty
- much also in the project stages right
- like it's not getting implemented
- anywhere at the at a at a DSO level or
- at a local level.
- >> So the uh we had some projects
- investigating it and we had some
- demonstrations. Um there were a lot of
- ch a lot of challenges in that regard
- but we managed to get it. I think the
- project came at an earlier stage. Um it
- was called car to flex. It was it was a
- very successful project at the end also
- won many awards. So we were quite proud
- of it and that was led um by Tuv at the
- time. Um but yeah I mean it was yeah
- something that we investigated in a
- demonstration mode with different use
- cases. So again, it was more from an
- individual household perspective, car
- ownership as well as other use cases
- such as car sharing because that's also
- becoming a good topic at the moment when
- it comes to um how we want to use
- e-mobility and or mobility in general
- amongst the cities and then also from a
- fleet perspective and again from a fleet
- perspective here. We also see a lot of
- potential here where for example
- businesses want to electrify their
- fleets and then they can use these
- potentials like let's say for example
- overnight where you can have a vehicle
- to grid supporting system when the cars
- are not being used basically.
- >> Yeah. Just to understand the concept but
- uh car sharing you mean literally share
- the car and not own it.
- >> Yeah. So
- >> okay because I heard also like cars
- changing charging cards that's another
- word then car sharing in this context
- car sharing. the sharing cost basically
- many you have basically a fleet of
- vehicles that people can use to share
- amongst a community for example.
- >> Yeah. And I heard I've heard only that
- in only in Germany it's allowed now
- vehicle to grid and they are making
- tests but it's not spread uh yet and
- also you you both have been in this uh
- scalability and replicability analysis
- SR
- a sorry
- >> uh so why would you say that these
- analysis are so critical from a
- perspective that you are coming from a
- theorical
- and research approach into a real world
- problem if you could tell us more about
- it.
- >> I mean this is entirely barbarous topic.
- >> [laughter]
- >> Well, I mean it's both topic but it's an
- interesting topic and I think
- scalability and replicability analysis
- is a very important topic as you already
- mentioned and I mean looking just for
- example at the scalability so for
- example we might be able to develop
- certain solutions but what does that
- mean when we actually start implementing
- them in the real world at a larger scale
- so I mean I think adopting certain uh
- technologies and approaches also needs
- to be tested in such a way so we like to
- do scalability and replicability
- analysis um and what does that really
- mean and also looking at because the
- networks for example are very
- heterogenous and there's no
- one-izefits-all. So when we look at
- replica replicability analysis, what
- does it mean if we want to implement
- certain solutions in different types of
- grid for example in different regulatory
- um aspects or in different countries
- under different scenarios um and testing
- if this actually really works and how it
- works and how it how it differs for
- example. Now just uh thinking about we
- went to AIT one month ago and we were
- shown this uh EV charger which is for a
- project for India actually
- >> and
- >> low voltage
- >> low voltage I think yeah but it's in DC
- >> that was the the megawatt charger yeah
- which is one of the the winners for last
- year Cisco prize was it in the green
- >> so so you had to study the the other
- countries reality to to know how to
- implement it. Yeah. So I mean like I
- said every country has their own
- challenges and they might have their own
- regulations for example. They might have
- their own grid codes. Um also just from
- a a technical perspective they might
- have different challenges because the
- grids are different. They different
- voltages for example different ages more
- rural uh networks more urban networks
- depending on where you want to place
- these um charges for example in this
- case. Um but it's just in general with
- solutions because there's no
- oneizefits-all. I mean we try to make
- solutions that are applicable and
- modular for most cases but of course we
- also have to understand what the
- differences are if they are and how they
- actually impact our solutions and if
- they do or if they don't.
- >> Super cool. [laughter]
- >> Super cool.
- >> Just to understand the grids better as
- well. Um my contention is that as you're
- saying that the grid from different
- countries will be different as well. So
- within Europe there there might be some
- some sort of homogeneous
- uh genity within the the grid system.
- But when you have to compare that to
- let's say somewhere from Asia where the
- it's it's a bit younger grid let's call
- it like that. So
- >> I mean also different challenges exist
- in different countries. I mean just
- talking for example from a South African
- perspective there we also have see
- different challenges there. I mean there
- we have yeah different voltage levels
- for example the infrastructure might be
- different aged in a different way. We
- have different technologies. Um so
- there's challenges that differ from
- country to country and I mean that's one
- aspect where we see for example the
- ISCAN initiative which is the
- international smart grid action network
- and here we also collaborate with many
- countries across the world and
- identifying what the challenges are
- learning about their lessons learned for
- different technologies we have different
- working groups there in particular I'm
- working in the working group six which
- is also on transmission and distribution
- grids and there again we allow knowledge
- sharing activities to to happen and here
- we can exchange and yeah share sharing
- ideas
- >> and you're the representative from AIT
- or from Austria.
- >> Um so I'm just one of the members of the
- working group six and I'm running an
- activity there on grid forming units in
- particular but I mean there are many
- different activities ongoing within
- ISCAN itself. Yeah.
- >> And and the the the the institute itself
- the Ikan is for all countries.
- >> Yeah. It's depends on the member states.
- So every country can can apply and yeah
- it's a little bit yeah complicated huh
- >> that's exactly the uh the reason why
- SRRA is so important and actually
- Barbara also did the SR for this project
- it's called gritcloud
- >> mhm
- >> yeah it's uh Aeronet project uh funded
- by three funding organizations the
- Austrian German as well as uh the
- Turkish uh funding organization and we
- had the uh I think the second biggest uh
- distribution system operator in Turkey
- uh GDC electric as part of the the
- project 50 million customers. So it's
- >> wow
- >> quite large compared to the uh the
- Austrian uh grid uh and distribution
- companies.
- >> Um so there we performed or Barbara and
- a few other colleagues performed the
- scalability and replicability analysis
- to ensure that the solutions that were
- developed in in Austria can actually be
- extended to a country that is uh close
- to Europe but is still beyond Europe. uh
- to make sure that um these solutions can
- actually be implemented and deployed uh
- in Turkey.
- >> Look, just putting more ingredients in
- the soup, but I remember you mentioned
- something that uh
- >> you also take into account climate
- changes into the electrical system to
- address risks. For example,
- um uh stronger winds or more
- thunderstorms or more like
- >> Absolutely. How how how do you address
- all of this?
- >> Yeah, it's it's a challenging task
- because right now uh we are seeing that
- uh some regions across the world uh and
- especially right now in in in Turkey
- where uh one of the pilots of the of the
- project was it's u it's called the
- Karabun Peninsula which is an hour away
- from Ismir on the on the Mediterranean
- Sea. That region is especially hit by
- adverse uh climatic events like extreme
- winds, thunderstorms,
- um significant rain, uh and their their
- entire distribution infrastructure is
- above ground. So if it was underground,
- then of course it would be affected
- less, but they're above ground. Uh so
- the cables are exposed and their the
- distribution towers are exposed to all
- this
- >> the heat
- >> adverse heat and then everything. It's
- it's rain and then wind. Wind is
- actually the major issue. wildfires.
- >> And wildfires. Yeah, absolutely. Yeah.
- And uh that's the reason we wanted to
- install sensors on top of these
- transmission or distribution towers and
- to be able to do predictive maintenance.
- So the goal is to be able to predict
- >> and to figure out when a fault could
- occur because of this climatic event. So
- we track a lot of different data points
- so that the the teams who are
- responsible for going and fixing the uh
- the grid if there is a breakdown. So
- they're already prepared. So it's just
- the point is to to minimize this this
- downtime
- >> as much as possible.
- >> So that's the the whole point of the of
- the project.
- >> Just one following question because we
- we read that you are
- pretty much expert in to place or to um
- estimate where to place the sensors. If
- you have to place uh five sensors in a
- load line for example
- >> in a feeder.
- >> Yeah.
- >> And which sensor what do you sense
- where? Yeah,
- >> there's no obvious answer for this
- question. It really depends on on the
- specific uh feeder that you're looking
- at. Yeah, because uh what we found out
- on on many research projects a few years
- ago and also continuing the work right
- now. Also part of the Husco by the way
- with the Volter solution is uh some of
- our colleagues who are experts on on
- data analytics and and AI. So they were
- able to develop a a state estimation
- method
- >> which uh which proved that we actually
- don't need uh measurement devices or
- sensors at every single node in the
- grid.
- >> So we don't need need this. So we only
- need it at some critical points in the
- in the grid. So with with the help of
- these minimal number of sensors you know
- five six whatever it is
- >> we can uh estimate the uh the voltages
- the currents the active power the
- reactive power and any other uh grid
- parameter with the help of this this
- small subset of of measurement devices.
- >> So
- >> and we're able to like prove this and
- and that's where the the ideal sensor
- placement is important.
- >> Mhm.
- >> Yeah. So we can algorithmically
- calculate
- um based on some methods that we have
- where is this you know this ideal
- location using which we can predict uh
- the other uh points in the grid.
- >> So it's kind of have a minimum cost
- digital twin.
- >> Exactly. So you're you're you don't need
- to invest uh millions uh in in full
- observability of the grid. This is not
- needed. So you can do let's say 10% is
- is the rule of thumb uh is enough to be
- able to get full observability of the of
- the grid.
- >> Dynamic operating envelopes are a hot
- topic. Barbara, your team is developing
- method for them. How do they actually
- change the conversation between DSO and
- the proumer?
- >> Yeah. So this is a very interesting
- topic for us and I think it's also
- coming up a lot in international um
- perspective. So for example in Australia
- they're very far advanced when it comes
- to the operational envelope topics but
- not to mention within our team itself we
- also have many projects that are
- investigating this topic and I think
- it's very interesting because we also
- want to see how we can adapt from this
- so-called static approach to a more
- dynamic approach to identifying when
- users are utilizing the grid and at what
- time of the day and how this can be used
- by the DSOs in a flexible way. So for
- example having a fixed connection point
- versus having a more dynamic connection
- point and how this changes is something
- that needs to be investigated and
- further developed within various
- countries.
- >> Yeah. Yeah. Energy management solutions
- for home and and there are there whole
- bunch of them within Austria within
- within Europe right now. Do you think
- that they will be uh going forward
- within the utilities themselves them
- having a software and then it's it's
- like a more market driven question but
- like they will die out or you think they
- everyone will have a place because of
- the decentralized system.
- >> So let me let me understand this
- question again. So you're asking me uh
- uh so you have a lot of different uh
- software developers and and you know
- vendors supplying energy mining
- solutions. Yeah, like there there many
- many so flexibility there there's a
- flexibility for the bigger assets there
- flexibility for the home assets and
- there there are many software with the
- optimizing what what Barbara was
- touching upon as well but going forward
- this
- >> at the grid level or at the house level
- >> at the house level
- >> you got to look at yeah behind the meter
- >> behind the meter or
- >> the meter one is a system level and one
- is more like based on behind the meter
- >> so so for example optimizing your
- battery your you know rooftop solar
- panel and your electric car.
- >> Yeah, I think yes.
- >> Yeah. And yes, there are a lot of them a
- lot of you know companies and startups
- >> and initiatives which have solutions for
- this uh market.
- >> Yeah. I mean uh because sometime I just
- feel that uh they there's so many of uh
- that optimization going on but uh on on
- what level and
- >> yeah I mean it's um it's it's it's an
- interesting uh market to be in because
- uh the uh barrier of entry is I would
- say lower than the companies who do
- system level optimization because that
- needs a lot of expertise in part system
- engineering in uh and in software
- development and you know these two needs
- to like these two domains need to like
- coincide really well
- >> and that's the reason solutions like
- Wterara and Rapsson and all of that can
- only come out of uh research
- organizations like AIT or utilities
- themselves or DSOs themselves. So all
- the all the market participants and or
- the market itself or the distribution
- industry tends to be a bit more
- challenging to enter and that's the
- reason there are not many players in the
- distribution energy management scale
- >> and and you will also talk to the DSOS
- directly you because
- >> we always talk to the DSOs
- >> and and it it will limit to them that if
- they're going to extend the benefit of
- the 30% and uh efficiency that you're
- telling
- >> that's the planning.
- >> Okay.
- >> Yeah. So the market of the grid planning
- is different from the operation uh
- software market
- >> right. So so wter uh with the host price
- that we won it's it's a control solution
- for the operations
- >> Mhm.
- >> itself. So operation of different assets
- in the grid and how we manage it and how
- the voltages and then the loading of the
- grid uh in is you know behaving in terms
- of uh uh uh you know different
- flexibilities that that are available
- and how we can it's like a control
- day-to-day operation of the of the grid
- >> and Rapson is is a planning tool so it
- helps DSO teams plan better for the
- future.
- >> Okay. And
- >> two different market segments here.
- >> Yeah.
- >> Yeah. And in terms of in in the market
- of grid operators in your opinion what
- is the actually or or how actually helps
- these LLMs in the control room?
- >> Yeah.
- >> For grid operators but where I mean how
- actually help but and what is the
- the border where the operators will say
- okay LLM doesn't work here. This is
- >> yeah I mean this is this is an
- interesting question right so we're also
- trying to answer this question um at IT
- in our in our teams right now the uh
- control room of uh of the DSOS's uh
- let's say a scattera system or an
- advanced distribution manage system um
- and some of the biggest you know
- companies in the energy industry uh they
- have their own products in this regard
- and these are extremely closed systems
- because they're part of a critical
- infrastructure so right Now no DSO in
- Europe at least based on you know all
- the DSOs that we have spoken to is
- willing to or even interested in putting
- any kind of AI or large language model
- >> anywhere close to the scholar system
- >> this is not happening
- >> also any securities around like
- >> this is a part of a critical
- infrastructure so any decision that you
- make it's it's super critical that that
- it doesn't lead to some kind of adverse
- effect on the grid yeah and AI is
- blackbox so they don't know how the
- decisions of AI and and what kind of
- decisions it's making and how that would
- affect the the grid. So this is not
- happening in anytime future. Uh but
- there there could be um some kind of
- supervisory an advisory system which is
- parallel to this kind of system which
- doesn't have any kind of real control
- over any of the assets
- >> but just advising the the controllers
- the operators of the of the grid in the
- control room to take one action or the
- other. So this is possible. there
- already tools out there which provide
- this kind of let's say supervisory and
- advisory support
- >> mhm
- >> for the uh for the operators and then
- they still have to have the expertise
- which they do to say yes okay this is
- the right decision uh which is coming
- out of an AI LLM or any other AI tool uh
- and if they want to execute this
- decision in the real SCA system which
- has a direct impact on the on the grid
- or not
- >> so we are changing one black box from
- the electrical grid to a black books in
- AI.
- >> Yeah. [laughter]
- >> Okay.
- >> It was very interesting. Uh we asked
- this question to also uh Philip Han from
- Cyber Grid
- >> and and uh and it was interesting. He
- said he would always like a human to be
- >> at the end of the levels.
- >> Exactly.
- >> He would not at least at this level he
- would not entirely leave it to the
- system.
- >> Yeah.
- >> Fully agree. [laughter]
- >> Yeah. Fully agree. Barrett, you when you
- pitch to offer digital services to TSOs
- and DSOs, what are the honest interest
- from these companies to acquire digital
- services?
- >> Mhm.
- >> And what interest they show you
- >> with this? Yeah, I mean right now a lot
- of uh DSOs as well as TSOs are under a
- lot of pressure to uh to adapt to this
- changing uh world that we are uh
- increasingly living in uh energy crisis
- uh crisis in terms of grid complexity.
- So right now the figures are up I think
- five million devices in terms of
- electric vehicles, photoable tech
- panels, heat pumps, uh wind parks that
- are uh waiting to be connected every
- year and the grids are not prepared for
- for this kind of uh uh uh uh transition.
- Yeah. And um they are openly uh uh and
- increasingly getting more interested in
- this new approaches because uh we cannot
- uh plan the grid with the tools of 1990s
- to the plan the grid of the 2040s.
- >> We agreed that it was built in the 70s
- >> with the grid that was built in
- [laughter] the 70s. Exactly. Yeah.
- Exactly. So uh and that's the reason uh
- increasingly seeing a lot of DSOs who
- are extremely interested in those
- digital tools this innovative tools that
- are coming up which is amazing for us
- right because we've been working on all
- the solutions for the last 10 years and
- and now the the pressure is really
- mounting and then they want to see these
- tools in reality they want a lot of lot
- more pilot uh interest to actually see
- it in real life because uh um of course
- they want to make sure uh that the grid
- is still stable to when they adopt this
- the solutions So rightfully yeah. So
- because a lot of uh people I myself in
- the past have have uh repeatedly
- mentioned that the DSOs are conservative
- but now I'm after talking to them like a
- lot in the last you know year or so.
- >> I I I totally understand why this
- conservatism comes from. Yeah. It's
- >> because the grid is is in in Austria and
- in Europe are one of the best in the
- world. Yeah. The the the numbers speak
- for themselves. You know 99.9998%
- reliability is unbelievable. That kind
- of mindset is still here because we
- still want to maintain this reliability,
- this level of reliability. Yeah. And I
- totally get it now. Yeah.
- >> And have you seen some kind of
- difference like generationally like the
- old experts from the old grid and now
- with new professionals with new tools
- what is the resistance and the
- acceptability? It's every every
- generation of of uh grid planner, grid
- operator is understands the the issue
- that we're facing right now and they
- want to change and they want to adapt
- new solutions. But the the main issue
- that the DSOs are also facing is that
- all the experience uh uh experienced
- older generation professionals are
- leaving and retiring.
- >> Yeah.
- >> So then what happens? Yeah. I mean
- that's that's kind of a bit of a risk,
- isn't it? Because if you're a grid
- operator,
- >> you have such experience the technicians
- and professionals who are taking all
- this knowledge that's basically not
- written down anywhere. Yeah.
- >> And then uh the new technicians are
- coming in they they they simply cannot
- you know comprehend because it's a very
- complex system. So they need to like
- impart this knowledge to the new
- generation of technicians and then
- retire. So this is a huge risk right now
- in in Europe and uh it's you know
- commonly known as tacet knowledge
- >> in in AI space. So we weren't able to
- like capture that somehow and then
- deliver or pass it on to the next
- generation of power system engineers.
- >> Yeah. Well, recently we published in in
- our social media uh research about
- energy skills and in in the last two
- years in Germany and and Austria and
- it's very aligned with uh international
- energy agency report that it's a lack of
- professionals and skill in energy
- sector. So we are addressing this in the
- bridge. We are building um community
- intelligence and we want to capture and
- keep involved the old professional that
- that are in this retiring period and to
- accelerate the learning curve for the
- new ones. Y
- >> so yeah keep in touch with the because
- we are going to bring some news about it
- that we are building this uh energy
- brain
- >> and Barbara you're a task leader in IEA
- ISCAN working group six that you earlier
- mentioned so what role does ISCAN play
- in bridging the gap between the national
- grid initiative and the global knowledge
- sharing and how much of the sharing
- really happens because a lot of the time
- like uh what is going on is that the
- even who DASOS do to not share so much
- of knowledge among themselves. So we we
- are talking about knowledge sharing
- between countries. So how much of the
- knowledge
- >> I mean of course it's not specific data
- sharing um but it's more about
- approaches and lessons learned from
- implementing certain technologies. So I
- think that's what the biggest benefit
- again like I already mentioned as taking
- aspects from use cases regulatory
- sandbox aspects bringing together what
- is been identified it's I mean it's a
- wide range of topics. is not only the
- from the technical perspective but also
- from the adoption of actually people
- from a a customer perspective what the
- challenges are there and how to address
- them and I think those lessons learned
- are valuable especially to identify what
- countries are doing what and how how
- their solutions can be implemented so
- it's more not it's I mean some in some
- cases it can be very technical but also
- on a policy level what policy measures
- should be changed how to accelerate
- certain adoption of certain technologies
- >> yeah and Barbara you're also a national
- expert
- uh in cigarette C6 what what are the
- emerging topics right now within the
- community and what do you think is the
- community underestimating
- >> yes this is also a very big topic um I
- think flexibility is still a hot topic
- but also I see a lot of interest moving
- towards this grid forming topic so also
- identifying what it means for the DSOs
- and also on the TSO level and I think
- this is something that's very much
- emerging it's underestimated because
- there's still so many unknowns and we
- not really sure of what's going to
- happen in the future but it's something
- that I see emerging and coming up as a
- hot topic and it's something that should
- be addressed.
- >> What do you think about the current
- increasing interest into having more
- solutions in DC? I mean we were talking
- about the electrical system is super
- conservative and it has been worked with
- AC for many many years and now we are
- coming back with Edison using DC.
- >> So Tesla for the win Edison is coming
- back. Yeah.
- >> Yeah. Exactly. So what do you think
- about it?
- >> Yeah. So definitely we also see that DC
- is becoming a hot topic now and there's
- also a lot of many aspects that are
- still unknown and challenges. So for
- example things like uh rectifier options
- things like protection is still a big
- question. Um but these technologies are
- definitely coming up as a solution and
- DSOS are interested in it seeing what is
- what's going to happen. So for example
- we have many use cases. So for example
- again like the megawatt charging system
- what it actually means for the grid
- operators where they can also look at it
- as an alternative to network
- reinforcement because of course then we
- can have a higher capacity transfer
- within the grid and this topic for
- example even ships aeroplanes uh DC hubs
- and so on.
- >> Um we're looking at data centers coming
- up in the future and so on. Yeah.
- >> Yeah. Actually we are having a session
- in the forum that we are having in June
- and one session will be only about data
- centers and there is a company which is
- >> calculating where to place them also
- optimally. So it's yeah super exciting.
- >> Yeah that's the uh grid planning teams
- uh nightmare to to place data centers.
- >> Yeah sure
- >> and also of course DSOs to to approve
- the the project and upgrade the grid.
- Yeah.
- >> Yeah. And that's a paradox right because
- data centers are paying for the DSO but
- they are bringing AI which is the
- solution. So [laughter]
- >> yes yeah for sure yeah the timing is the
- the issue right so it's yeah we need the
- data centers right now but the grid is
- not ready and uh
- >> plan better to have more data centers of
- course yeah AI is is great and we need
- more data centers for sure. Now we go to
- the last part which is the quagfire
- round and the third question is what
- would you do with 1 billion euros to
- accelerate energy transition.
- >> Okay. So for me personally I think
- electrification is still a big topic. So
- this idea of energy poverty we see many
- in many countries where many people
- still don't have access to electricity
- and I think putting the investment there
- is also a big topic that we should be
- considering. So for example like in
- emerging countries where some people
- don't even have the basic essential of
- turning on a light bulb for example and
- that's something we should address in
- applying and allowing people to have
- this idea of energy security.
- >> Now Europe is electrified like in 22 23%
- approach do you know or how much do you
- think that Europe could be electrified?
- No
- >> that's a good yeah big question. I think
- it also depends on industries and
- updating the industries there for
- example. But I think I mean a for
- example and Europe in general is quite
- established when it comes to
- electrification especially on the
- household level. But I think moving
- forward to applying for different
- industries as industry is growing. Um
- also finding ways to make them more
- efficient. I think that's a bigger topic
- at the moment.
- >> Yeah. But could it reach 30% any soon?
- Because China, we went to China recently
- last year and they are near to 40
- >> electrified they say.
- >> I mean I think I think these are
- challenges that the DSOs are addressing
- here within Europe. So I think it's very
- much on their radar as well alongside
- all the other challenges that they're
- addressing. Yeah.
- >> So electrification that's pretty much
- that's my investment for the future.
- Yeah.
- >> You did you say 1 billion or 1 billion?
- >> Wow. 1 billion is a very small amount.
- You're not you're not
- if you say if you say one trillion then
- then we can talk.
- >> Okay.
- >> Yeah. Because because Europe Europe is
- uh already investing 400 billion in the
- next 10 years for electrification and uh
- grid expansion and grid retrofit.
- >> Oh wow. Yeah.
- >> So the scale is 1 trillion. Yeah. Then
- then I would put all of that into
- carefully uh uh retrofitting and uh
- reinforcing uh the grid so that we can
- already uh integrate a lot more
- renewable energy and and speed up the uh
- energy transition
- >> and unlock all the projects waiting in
- the
- >> exactly there's a lot of projects
- waiting uh in in the in the queue. So to
- already unlock this as quickly as
- possible because this ties into the
- whole energy sovereigntity, energy
- poverty pretty much uh all the u the big
- bets that have placed on energy
- transition. So that would unlock
- everything. That's where I would put the
- one trillion
- >> one trillion.
- >> Yeah.
- >> Cool.
- >> If you had to pick one technology or
- method that will reshape distribution
- planning by 2030, what would it be? And
- how much of the TSOS and DSL are into
- network planning? Are they planning for
- 2030 or they're planning further?
- >> Yep. Yeah, that's a wonderful question.
- Um, a super relevant question as well.
- So, uh, uh, I think I spoke to 17 DSOs
- in the last, let's say, three or four
- months for, of course, Rapson, my
- startup.
- >> And, uh, uh, every single one of them
- uh, mentioned to me that they're right
- now so stressed with so many connection
- requests that are getting at the moment.
- So, they're really putting out fires. uh
- every day to to be able to accommodate
- all these new requests. Uh according to
- the European regulation as well as a lot
- of national uh regulations, they are
- required to produce
- >> mhm
- >> uh a national development plan NDP every
- two years which also includes uh future
- planning as well. So how the grid will
- evolve in the in the future and they do
- this based on a lot of different
- methodologies. You it really depends on
- the on the DSO themselves. uh but they
- uh or at least what I found out was they
- absolutely uh would love to have a tool
- that can automate a lot of these things
- because they're of course you know also
- hit by the same challenges that uh the
- whole industry is is experiencing not a
- lot of engineers who can uh help with uh
- with you know doing all this very
- tedious calculations
- >> and Rapson can somehow automate it and
- and by the way in Rapson uh we will have
- uh just one button if you just click on
- this button instantaneously you'll get a
- fully developed network development
- plan. Wow, that's nice.
- >> And what would you say is the most
- overhyped technology currently?
- >> Blockchain is definitely over. So that I
- can certainly uh say that for sure.
- >> I mean it's overhyped for anything like
- not [laughter]
- >> Yeah. But it was especially high for
- energy right and and also uh from the
- grid uh point of view and that is
- definitely not happening. Yeah. And in
- the energy sector maybe the most
- underrated concept that is now what
- would you say that is the hidden gym?
- >> So we have one of our uh PhDs within our
- group uh uh especially specifically
- focusing on how to uh speed up uh a load
- flow method.
- >> Okay.
- >> Yeah. It's it's such a fundamental uh
- tool that everybody uses in in power
- system engineering. every single DSO TSO
- every single day someone is you know
- calculating a load flow
- >> right and then there are uh standard
- state-of-the-art methods
- >> and uh our colleague Alper
- uh he's working on speeding this up by
- let's say a margin of 10
- >> mh
- >> and the implications are actually quite
- significant with this just a 10 10 time
- uh increase in in the conversion speed
- of of a loadflow is extremely
- significant because we are if you want
- to use AI solutions and if you want to
- uh calculate a lot of you know load
- flows in loop this really adds up at the
- European scale. So I would say uh a
- humble loadflow tool to to make it
- faster I think this is like super
- underrated right now in my opinion needs
- to get a bit more attention.
- >> Yeah. If uh young electrical engineer
- ask you today whether to go into grid
- planning physical grid operation or AI
- for energy what would you tell them? I
- mean in general what advice you would
- give to the young engineers getting into
- this field? Yeah, I mean I think we've
- identified already that there is a bit
- of a shortage gap coming up in the
- future and trying to encourage younger
- generation to follow through and
- becoming more engineering uh topics such
- as the ones that you've already
- mentioned and I think this is the big
- challenge um trying to make power
- systems look sexy is a bit yeah
- challenging for us but I think going
- forward this is the future and I think
- everybody has a major role to play and I
- think the sooner we address this the
- better and everybody can be a superhero
- in the energy transition and I think
- that's what makes the And I think making
- sure that the people are and the younger
- generation is more aware of these topics
- and how they can actually contribute to
- creating this change is what makes it
- more challenging and is the way forward
- basically.
- >> And you
- um I would say education talking more
- about uh u energy transition uh which is
- happening already. I think uh Gen Z uh
- is extremely climate conscious which is
- very hopeful. Yeah, I'm very happy about
- that.
- >> Yeah. and uh they are uh extremely uh
- more active compared to other
- generations going out and doing
- something about it which is also very
- hopeful. Yeah. And uh I also see that
- there is I would say an uptick in uh
- interest in the engineering uh streams.
- >> Okay. So in that note, thank you very
- much for coming today. We are very
- exciting also to having you both in the
- forum in June. Barrett, you're going to
- maybe moderate the biggest session. It's
- It looks very good. Uh so yeah, thank
- you very much. I hope you enjoyed it as
- much as we did. Um looking forward for
- seeing you in the forum and congrats
- again for the Galardon. [clears throat]
- >> Thank you so much. Yeah, it's always
- wonderful to to talk to you guys and
- also be back at the Energy Bridge
- headquarters here in Vienna. Uh yeah. Uh
- I'm I'm really looking forward to the uh
- to the sessions that uh that you were
- I'm still in a bit of a dark darkness
- here, so I don't know what to expect,
- but I'm sure it's going to be amazing.
- >> Yes,
- >> you will see.
- >> Thank you very again.
- >> And just from my side, thank you very
- much for the invitation. It was very
- exciting to be here and talk about my
- favorite topics. [laughter] So I'm
- looking forward to seeing what comes out
- of this energy bridge um podcast in the
- future. And yeah, I wish you guys all
- the best.
- >> Thank you very much, Barbara.
- >> Thank you. And thanks for the comm to
- the community for watching the episode
- until the end. And keep tuned for next
- interviews and for the [music] forum in
- June. So see you. Chowo chiao.